📚 Guides All topics ❓ Help & FAQ How it works 📅 Key Dates Know your deadlines 📞 Helplines Free support numbers

Report an Issue

Tell us what went wrong and we'll look into it. We'll be in touch as soon as we can.

Your name and email will only be used to respond to your report. See our Privacy Policy.

Share Your Feedback

Good or bad, we'd love to hear what you think. No strings attached.

Your feedback helps us make the site better for everyone. See our Privacy Policy.

Electrical safety

Electrical safety in private tenancies: Northern Ireland

The electrical safety rules for private landlords in Northern Ireland: the 5-yearly inspection, reports and codes, remedial work and what councils can do, in the official words.

Last reviewed: 27 November 2026 Sources: listed at the end Northern Ireland

This guide is for private landlords and tenants in Northern Ireland about the electrical safety rules for private tenancies. Each section shows the exact words of the law or official guidance, with a link to the page they come from.

What do the Regulations mean for tenants?

Department for Communities says

These Regulations mean that a tenant in a property let under a private tenancy should expect the property to meet the required electrical safety standards. A landlord, therefore, must have the electrical installation checked at least every 5 years by a properly qualified person. The electrical Installation must be safe, and a landlord must give a tenant proof of this. Tenants should:
  • check they have been provided with a copy of the latest electrical safety inspection report.
  • report any electrical problems, or potential problems, which occur in between the 5-year inspection period to the landlord so that remedial action can be taken.
  • contact your local Council if the landlord has not taken remedial action after you have reported a fault. Find your local council
  • allow access to the property for the electrical safety inspection to be completed by the qualified person, and if necessary, allow further access for remedial work to be completed.

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

What standard must the electrical installation meet?

Department for Communities says

The standards that should be met are set out in the 18 th edition of the Wiring Regulations. The Regulations state that a landlord must ensure that electrical safety standards are met, and the investigative or remedial work is carried out if the report requires this. Existing installations that have been installed in accordance with earlier editions of the BS 7671:2018 may not comply with the 18 th edition in every respect. This does not necessarily mean that they are unsafe for continued use or require upgrading. When undertaking an EICR the electrician/competent person will provide an assessment of the in-service condition of an electrical installation against the requirements of the edition of BS 7671 current at the time of inspection, irrespective of the age of the installation. The EICR will show whether the electrical installation is in a Satisfactory or Unsatisfactory condition and will detail a list of observations (if applicable) affecting safety or requiring improvements. In practise, if the report does not require investigative or remedial work, the landlord will not be required to carry out any further work. The landlord will need to liaise and agree with the tenant a suitable time and date for the electrical safety inspection to be completed. Additionally, if remedial work is identified from the inspection a suitable time and date must also be agreed with the tenant, to have that work completed. A landlord should keep evidence they have taken all reasonable steps to gain access to the property.

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

How does a landlord find a qualified person to inspect the electrics?

Department for Communities says

Guidance has been produced by the electrical safety industry that covers how landlords can choose a qualified and competent electrician and tester. This includes but is not limited to:
  • Finding an electrician
The electrical safety industry has established a competent person schemes membership of these will not be compulsory to ensure there is no further pressure placed on the industry, nor undue burden placed on inspectors and testers. When commissioning an inspection, to establish if a person is qualified and competent landlords should:
  • check if the inspector is a member of a competent person scheme; or
  • require the inspector to sign a checklist certifying their competence including their experience whether they have adequate insurance and hold a qualification covering the current version of the Wiring Regulations and the periodic inspection, testing and certification of electrical installations.

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

What does the electrical inspection look at?

Department for Communities says

The inspection will investigate if:
  • any part of the electrical installation is overloaded/damaged
  • there are any potential electric shock risks and fire hazards
  • there is any defective electrical work
  • there is a lack of earthing or bonding – these are 2 ways of preventing electrical shocks that are built into electrical installations

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

What do the codes on an electrical report mean?

Department for Communities says

The electrical installation should be safe for continued use. In practice, if the report does not require investigative or remedial work the landlord will not have to carry out any further work. The inspection report will use the following classification codes to indicate where a landlord must undertake remedial work.
  • Code 1 (C1): Danger present. Risk of injury. The electrical inspector may make any C1 hazards safe before leaving the property.
  • Code 2 (C2): Potentially dangerous.
  • Further Investigation (FI): Further investigation required without delay.
  • Code 3 (C3): Improvement recommended. Further remedial work is not required for the report to be deemed satisfactory.
If codes C1 or C2 are identified on the report, then remedial will be required. The report will state the installation is unsatisfactory for continued use. If the inspection identifies that further investigative work is required (FI), the landlord must also ensure this is carried out. The C3 classification code does not indicate remedial work is required, but only that improvement is recommended. Landlords do not have to make the improvement, but it would improve the safety of the installation if they did.

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

What about new build properties or new electrical installations?

Department for Communities says

If a property is newly built or has been completely rewired, it should have an electrical installation Certificate know as an EIC. Landlords must provide a copy of the EIC to tenants and, if requested, to the Council. The landlord will not be required to carry out further checks or provide a report for 5 years, after the EIC has been issued, as long as they have complied with their duties under the Regulations.

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

What must an EICR include?

Department for Communities says

In the majority of cases the 5 yearly inspections will generate the completion of an Electrical Installation Condition Report (EICR). The EICR must be completed by a qualified person as defined within the Regulations. The EICR must cover the following installations for the supply of electricity; electrical fittings, including –
  • the consumer unit(s)
  • switches
  • socket-outlets
  • light fittings,
  • any visible wiring, and
  • any areas where electrical equipment may be installed, (for example lofts with supplies to renewable energy sources), and
visual inspection of fixed electrical equipment, including –
  • fixed electrical heating equipment e.g. storage or panel heaters,
  • electric showers and over/under-sink water heaters
  • boilers and other heat producing equipment, and
  • hard-wired smoke and fire detectors.

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

Department for Communities says

The person carrying out the inspection must complete and clearly set out on the EICR –
  • the date of the inspection
  • the full address of the property inspected
  • the name and address of the landlord or their agent
  • the name and address of the person carrying out the inspection
  • evidence that person completing the inspection report is a qualified electrician as defined at Section “The Inspection”
  • a description of each installation, fixture and fitting inspected, and its location in the property, and
  • any defect identified.

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

Department for Communities says

The landlord must replace or repair any electrical installations, fixtures, fittings, or equipment which fails to pass electrical safety inspection within 28 days or whatever date has been specified in the EICR.

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

What do the EICR codes mean for remedial work?

Department for Communities says

The qualified person completing the EICR will use the following classifications codes to indicate where a landlord must undertake remedial work.
  • Code 1 (C1): Danger present. Risk of injury. The qualified person should make any C1 hazards safe before leaving the property.
  • Code 2 (C2): Potentially dangerous.
  • Further Investigation (FI ): Further investigation required without delay.
  • Code 3 (C3): Improvement recommended. Further remedial work is not required for the report to be deemed satisfactory.
If the codes C1 or C2 are identified on the report, then remedial work will be required. The report will state the installation is unsatisfactory for continued use. If the qualified person identifies that further investigative work is required (FI), the landlord must also ensure this is carried out for the tenant’s safety. The C3 classification code does not indicate remedial work is required, only that improvement is recommended. Landlords do not have to make the improvement, but it would improve the safety and may improve efficiency of the installation if they did. An EICR will recommend any remedial action required to ensure that the electrical installation is in a satisfactory condition for continued service, but any remedial work which is undertaken must be recorded separately on a Minor Electrical Installation Works Certificate ( MEIWC). If remedial work includes replacement of a consumer unit an Electrical Installation Certificate (EIC) should be provided.

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

What is a Minor Electrical Installation Works Certificate?

Department for Communities says

The MEIWC is used for any remedial work identified on the EICR, as evidence that the faults have been fixed. It is used when there needs to be additions and alterations to an electrical installation that do not extend to the provision of a new circuit. Examples include the addition of socket-outlets or lighting points to an existing circuit, the relocation of a light switch etc. If a replacement of a consumer unit is necessary an Electrical Installation certificate (EIC) is required.

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

What is an Electrical Installation Certificate?

Department for Communities says

An EIC is provided for new build properties and for properties that have been fully rewired. It may also be required for an alteration or addition to the electrical installation – like the installation of a new circuit and the replacement of the consumer unit. After 5 years this will be replaced by an EICR. A landlord who has an EIC for a property can provide this in place of an EICR to show compliance with the Regulations provided that the date of next inspection indicated on the certificate has not elapsed and the EIC covers the entire property such as for a new build or a complete rewire. An EIC for a replacement of a consumer unit is not sufficient and would require and EICR in addition.

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

When must a landlord provide the electrical reports and certificates?

Department for Communities says

A copy of all the relevant reports and certificates (EICR, MEIWC or EIC) must be provided to the tenant within 28 days from the electrical safety inspection. Follow up paperwork to confirm that any remedial C1, C2 or FI faults have been actioned needs to be attached to the associated report within 28 days from the faults being rectified. If a Council official requests a copy of any relevant report and certificate (EICR, MEIWC, or EIC), landlords must supply a copy within 7 days of receiving the request. After an EICR has been completed with remedial actions noted (C1, C2 or FI) and the subsequently corrected. A new EICR is not required, providing the contractor can evidence that all the safety issues have been corrected and provides a statement of such (this can be on separate document or noted on any subsequent certificates).

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

What can the council do if a landlord does not do the remedial work?

Department for Communities says

If landlord does not carry out the necessary works or fails to supply a report to confirm the property meets the electrical safety standards, a Council has strong legal powers to act. They can require the landlord to do safety works or even do the works themselves if necessary. If the Council has reasonable grounds to believe that a landlord is in breach of one or more of the duties in the Regulations, they must serve a remedial notice on the landlord requiring remedial action. Should a landlord fail to comply with the notice, the Council may arrange for remedial action to be taken. The Regulations require that the authorised person must give at least 48 hours’ notice to the tenant. They may be asked by the tenant and the landlord to produce evidence of their identity and a letter from the local housing authority confirming their authority to carry out the required works. The Council can recover costs of taking this action from the landlord. The landlord has the right to appeal against a demand for costs. Where a demand for the recovery of costs is payable by the landlord, the Council will enforce payment by placing a Statutory Charge over the property of the landlord. The Statutory Charge will remain a restriction on the property until the costs are paid.

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

Department for Communities says

A landlord is not in breach of their duty to comply with a remedial notice, if the landlord can show they have taken all reasonable steps to comply. A landlord could show reasonable steps by keeping copies of all communications they have had with their tenants and with electricians as they tried to arrange the work, including any replies they received. Evidence could also include texts and call history. Landlords may also want to provide other evidence they have that the installation is in a good condition while they attempt to arrange works. This could include the servicing record and the pervious safety reports. A landlord who has been prevented from accessing the premises will not be required to begin legal proceedings against their tenant in order to show that all reasonable steps have been taken to comply with their duties.

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

Department for Communities says

If the report indicates that urgent remedial action is required, and the landlord has not carried this out withing the period specified in the report, the Council may with the consent of the tenant arrange to carry out the remedial work. The Council must authorise a qualified person in writing to undertake the remedial action and give at least 48 hours’ notice to the tenant. The cost for carrying out the remedial work can be recovered from the landlord. The landlord has the right to appeal against a demand for costs. Where a demand for the recovery of costs is payable by the landlord, the Council will enforce payment by placing a Statutory Charge over the property of the landlord. The Statutory Charge will remain a restriction on the property until the costs are paid.

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

Can a landlord appeal against a council notice or remedial action?

Department for Communities says

Yes, landlords can appeal against the decision of the Council. In the first instance, landlords have 21 days to make written representations to the Council against a remedial notice. The remedial notice is suspended until the Council consider representations. The Council must inform the landlord of their decision within 7 days. Landlords also have a right of appeal to the County Court against:
  • the decision to take remedial action by the Council. An appeal must be made within 28 days from the day on which a notice of remedial action is served.
  • a demand for the recovery of costs made by the Council following remedial action.
  • the decision to take urgent remedial action by the Council. An appeal must be made within 28 days from the day on which the urgent remedial action was started.
Councils can recover costs if they have to undertake remedial action and if that action goes into court a landlord has a right of appeal within the County Court and the decision of the judge will be final.

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

What if an electrical fault occurs inside the 5-year interval?

Department for Communities says

Throughout the time a tenant is living at the property, electrical safety standards must be met. In other words, the landlord has an ongoing duty to ensure that the property meets the electrical safety standard. If a landlord is notified of an electrical fault at any time within the 5-year interval for inspection the landlord must ensure that the fault is dealt with. Depending on the type of fault the electrical installation may need checked by a qualified person, and if necessary, remedial work undertaken (for example minor works, or a consumer unit replaced). If remedial work is needed then any report provided by the qualified person should be attached to the previous inspection report as detailed in Section “The Inspection” above, as evidence that the electrical safety standards have been met. See section “What type of report is needed, an EICR, EIC or MEIWC report”?.

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

Who pays for the electrical inspection?

Department for Communities says

We estimate that the average costs per property are around £200 for a 5-yearly inspection, this cost should not be passed on to the tenant or any cost for remedial work.

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

What is the consequence of not complying with the electrical safety rules?

Department for Communities says

A landlord who fails to comply with any of their duties under the regulations commits an offence. Where an authorised officer of a Council believes that an offence has been committed, they may take the landlord to court for non-compliance (for which the maximum penalty is a level 5 fine) or impose a fixed penalty notice.

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

Which tenancies do the electrical safety Regulations apply to?

Department for Communities says

The regulations apply to all private tenancies, including protected and statutory tenancies. However, Houses in Multiple Occupation (HMOs) continue to be covered under the HMO Licensing Scheme.

Department for Communities, The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024

Where to get help

Housing Rights: 028 9024 5640. Housing advice in Northern Ireland for landlords and tenants.

Your council's environmental health team: enforces tenancy information notices, receipts, deposits, alarms and electrical safety.

Landlord Registration Scheme: 0300 200 7821 (nidirect, read 17 Nov 2026).

Advice NI: 0800 915 4604. Free advice. Email advice@adviceni.net, or use the form on Advice NI's contact page.

Ways to contact Advice NI

  • Freephone advice helpline: 0800 915 4604.
  • Email: advice@adviceni.net, or use the form on Advice NI's contact page. Someone will reply within 3 working days.
  • Face to face: contact your local advice centre.
  • If you cannot hear or speak on the phone, you can use Relay UK to make the call by typing. Use the free Relay UK app, or a textphone: dial 18001 first, then the number.

If you cannot hear or speak on the phone, you can use Relay UK to make the call by typing: dial 18001 first, then the number.

Sources

Quotes from the Department for Communities contain public sector information licensed under the Open Government Licence v3.0.

Important disclaimer: This guide covers electrical safety in private tenancies in Northern Ireland as at 27 November 2026. It is general information, not legal advice.

Comments

Comments are loading…