📚 Guides All topics ❓ Help & FAQ How it works 📅 Key Dates Know your deadlines 📞 Helplines Free support numbers

Report an Issue

Tell us what went wrong and we'll look into it. We'll be in touch as soon as we can.

Your name and email will only be used to respond to your report. See our Privacy Policy.

Share Your Feedback

Good or bad, we'd love to hear what you think. No strings attached.

Your feedback helps us make the site better for everyone. See our Privacy Policy.

Housing Rights Guide · Wales

Repairs, Damp and Mould in Rented Homes in Wales

In Wales your landlord must keep your home in repair and fit for human habitation. What they must fix, how to report it, rent while your home is unfit, and what to do if nothing happens.

Last reviewed: 17 November 2026 Sources: listed at the end Wales only

This guide is for people who rent their home in Wales (contract-holders) from a private landlord, a council or a housing association, and whose home needs repairs or has damp or mould. It follows Welsh law. Each section shows the exact words of the law, gov.wales, GOV.UK, HSE or the Ministry of Justice, with a link to the page they come from.

Live in England, Scotland or Northern Ireland? The law is different: see the England guide, the Scotland guide or the Northern Ireland guide. England's Awaab's Law does not apply in Wales.

Not covered here: being given notice or evicted (see the eviction guide for Wales); complaints about how a council or housing association handled your complaint (see our housing complaints guide); problems with neighbours (see our neighbour disputes guide); leaseholders and flat owners (see the leasehold guide); lodgers who live with their landlord; how much compensation a court awards.

What must my landlord repair?

gov.wales says

The landlord cannot ask the contract-holder to pay for or carry out any repair where it is not the fault of the contract-holder.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

In addition to a landlord’s requirement to keep a home FFHH, section 92 of the Act requires a landlord to keep the dwelling in repair. This includes:
  • the structure and exterior of the dwelling (including drains, gutters and external pipes), and
  • the service installations in the dwelling, such as those for:
  • the supply of water, gas or electricity,
  • for sanitation, and
  • for space heating or for heating water.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

A landlord must always keep the dwelling in repair, but this may require the contract-holder to inform the landlord of any issues of disrepair that arise. Once the landlord is aware of the need for repairs, they must be carried out in a reasonable time and to a reasonable standard. This includes a requirement to make good any damage resulting from the repairs.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

Part 4 of the Renting Homes (Wales) Act 2016 (The Act) sets outs the obligations placed on a landlord with regard to the condition of a dwelling. These obligations apply to all occupation contracts made for a term of less than seven years. A landlord under an occupation contract is obliged to ensure a dwelling is both in repair and fit for human habitation (FFHH). Whilst this guidance addresses the requirement for a dwelling to be FFHH, it is important landlords also understand their complementary obligations regarding repair. Often, a primary cause of a dwelling being unfit for human habitation is the level of disrepair that exists. Tackling disrepair early and effectively can often prevent a dwelling becoming unfit for human habitation.

gov.wales, Fitness of homes for human habitation: guidance for landlords

ExceptionRenting Homes (Wales) Act 2016, section 95(2)

Exception

(2) Sections 91(1) and 92(1) do not require the landlord— (a) to keep in repair anything which the contract-holder is entitled to remove from the dwelling, or (b) to rebuild or reinstate the dwelling or any part of it, in the case of destruction or damage by a relevant cause.

Renting Homes (Wales) Act 2016, section 95(2)

ExceptionRenting Homes (Wales) Act 2016, section 95(3) and (4)

Exception

(3) If the dwelling forms part only of a building, sections 91(1) and 92(2) do not require the landlord to rebuild or reinstate any other part of the building in which the landlord has an estate or interest, in the case of destruction or damage by a relevant cause. (4) Relevant causes are fire, storm, flood or other inevitable accident.

Renting Homes (Wales) Act 2016, section 95(3) and (4)

ExceptionRenting Homes (Wales) Act 2016, section 95(5)

Exception

(5) Section 92(2) does not require the landlord to carry out works or repairs unless the disrepair or failure to keep in proper working order affects the contract-holder's enjoyment of— (a) the dwelling, or (b) the common parts that the contract-holder is entitled to use under the occupation contract.

Renting Homes (Wales) Act 2016, section 95(5)

The law says

"keep in repair the structure and exterior of the dwelling (including drains, gutters and external pipes), and" ... "keep in repair and proper working order the service installations in the dwelling."

Renting Homes (Wales) Act 2016, section 92(1)

The law says

“ service installation ” means an installation for the supply of water, gas or electricity, for sanitation, for space heating or for heating water.

Renting Homes (Wales) Act 2016, section 92(4)

The law says

If the dwelling forms part only of a building, the landlord must -
  • (a) keep in repair the structure and exterior of any other part of the building (including drains, gutters and external pipes) in which the landlord has an estate or interest

Renting Homes (Wales) Act 2016, section 92(2)

The law says

The landlord under a secure contract, a periodic standard contract or a fixed term standard contract made for a term of less than seven years must -

Renting Homes (Wales) Act 2016, section 92(1)

The law says

(3) The standard of repair required by subsections (1) and (2) is that which is reasonable having regard to the age and character of the dwelling, and the period during which the dwelling is likely to be available for occupation as a home.

Renting Homes (Wales) Act 2016, section 92(3)

The law says

(1) The landlord must make good any damage caused by works and repairs carried out in order to comply with the landlord's obligations under section 91 or 92.

Renting Homes (Wales) Act 2016, section 93(1)

Must my home be fit for human habitation?

gov.wales says

This means that a landlord must ensure none of these 29 things make the dwelling unfit for human habitation.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

"Damp, mites and mould or fungal growth: exposure to house dust mites, damp, mould or fungal growths." and "Cold: exposure to excessively low temperatures."

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

Section 91 of the Act requires a landlord to make sure the dwelling they rent is FFHH when the contract-holder moves in ( the occupation date ) and during the time the dwelling is rented to the contract-holder. The landlord cannot ask the contract-holder to do something to make the dwelling FFHH where a problem is not the fault of the contract-holder. The regulations about FFHH made by the Welsh Government are in two Parts. Part 1 lists the things to think about in deciding if a home is FFHH. Part 2 sets out things a landlord must do for a home to be FFHH.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

Part 1 requires a landlord to ‘have regard to 29 matters and circumstances’. ... Some of the 29 matters and circumstances will not arise very often, whilst others will be more common. For example, Matter 1 – Damp and mould growth, Matter 2 – Cold, and Matter 3 – Heat are more common problems than Matter 27 – Explosions, and Matter 29 - Structural collapse. However, landlords must consider all 29 matters and circumstances in determining whether the dwelling is FFHH.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

3. HeatExposure to excessively high temperatures.
4. Asbestos and manufactured mineral fibresExposure to asbestos fibres or manufactured mineral fibres.
5. BiocidesExposure to chemicals used to treat timber or mould growth.
6. Carbon monoxide and fuel combustion productsExposure to: carbon monoxide; nitrogen dioxide; sulphur dioxide and smoke.
7. LeadThe ingestion of lead.
8. RadiationExposure to radiation.
9. Uncombusted fuel gasExposure to uncombusted fuel gas.
10. Volatile organic compoundsExposure to volatile organic compounds.
11. Crowding and spaceA lack of adequate space for living and sleeping.
12. Entry by intrudersDifficulties in keeping the dwelling secure against unauthorised entry.
13. LightingA lack of adequate lighting.
14. NoiseExposure to noise.
15. Domestic hygiene, pests and refusePoor design, layout or construction such that the dwelling cannot readily be kept clean. Exposure to pests. An inadequate provision for the hygienic storage and disposal of household waste.
16. Food safetyAn inadequate provision of facilities for the storage, preparation and cooking of food.
17. Personal hygiene, sanitation and drainageAn inadequate provision of: facilities for maintaining good personal hygiene; sanitation and drainage.
18. Water supplyAn inadequate supply of water free from contamination, for drinking and other domestic purposes.
19. Falls associated with baths etc.Falls associated with toilets, baths, showers or other washing facilities.
20. Falling on surfacesFalling on a surface.
21. Falling on stairs etc.Falling on stairs, steps or ramps.
22. Falling between surfacesFalling from one surface to another (including falling from height).
23. Electrical hazardsExposure to electricity.
24. FireExposure to uncontrolled fire and associated smoke.
25. Flames, hot surfaces etc.Contact with: controlled fire or flames; hot objects, liquid or vapours.
26. Collision and entrapmentCollision with, or entrapment of body parts in, doors, windows or other architectural features.
27. ExplosionsAn explosion at the dwelling.
28. Position and operability of amenities etc.The position, location and operability of amenities, fittings and equipment.
29. Structural collapse and falling elementsThe collapse of the whole or part of the dwelling including falling elements.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

The aim of the legislation, both the Act and the FFHH Regulations, and this guidance is one of prevention, to ensure landlords maintain dwellings to prevent them from becoming unfit for human habitation. Prevention of any of the 29 matters or circumstances arising is the approach all landlords should be taking. Not only is this approach more cost effective for landlords but, more fundamentally, it will avoid contract-holders potentially living in unfit conditions.

gov.wales, Fitness of homes for human habitation: guidance for landlords

gov.wales says

Whether the dwelling is a fit place to live should, in the vast majority of cases, be clear to both landlord and contract-holder. Ultimately, where a dispute cannot be resolved, whether the dwelling is FFHH will be a matter for the court to determine.

gov.wales, Fitness of homes for human habitation: guidance for landlords

gov.wales says

The guidance draws on the guidance for landlords and property professionals issued in relation to the Housing Health and Safety Rating System (HHSRS). The Housing Health and Safety Rating System (Wales) Regulations 2006 (“the HHSRS Regulations”) prescribe the hazards associated with a risk of harm. A local authority will assess the dwelling by reference to these matters and circumstances and classes of harm also specified in the HHSRS Regulations to identify whether a Category 1 or 2 hazard exists. However, whether or not a hazard as set out in Schedule 1 to the HHSRS Regulations exists does not pre-determine whether a dwelling is unfit for human habitation in accordance with the FFHH Regulations. For example while a slight variation of floor surface may be a hazard under the HHSRS it would be highly unlikely on its own, to result in a determination that the dwelling is unfit for human habitation. In the example given above regarding the hazard of falling on a level surface, while a slight variation of floor surface would be unlikely to breach the fitness obligation, a local authority inspection may find it to be a hazard under HHSRS. If an elderly person is living in the dwelling, the local authority is likely to take enforcement action against the landlord.

gov.wales, Fitness of homes for human habitation: guidance for landlords

gov.wales says

The aim of the Fitness Regulations is to help ensure landlords maintain dwellings to prevent them from becoming unfit for human habitation.

gov.wales, Renting homes: frequently asked questions (tenants)

ExceptionRenting Homes (Wales) Act 2016, section 95(1)

Exception

(1) Section 91(1) does not impose any liability on a landlord in respect of a dwelling which the landlord cannot make fit for human habitation at reasonable expense.

Renting Homes (Wales) Act 2016, section 95(1)

Condition

Regulations 5 to 8 apply only in relation to— (a) a secure contract, (b) a periodic standard contract, and (c) a fixed term standard contract made for a term of less than 7 years, which incorporates section 91 of the Act as a term of the contract.

Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022, regulation 4

The law says

must ensure that the dwelling is fit for human habitation -
  • (a) on the occupation date of the contract, and
  • (b) for the duration of the contract.

Renting Homes (Wales) Act 2016, section 91(1)

The law says

(2) The reference in subsection (1) to the dwelling includes, if the dwelling forms part only of a building, the structure and exterior of the building and the common parts.

Renting Homes (Wales) Act 2016, section 91(2)

The law says

In determining, for the purposes of section 91(1) of the Act, whether a dwelling is fit for human habitation, regard must be had to the presence or occurrence, or the likely presence or occurrence, of the matters and circumstances listed in the Schedule.

Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022, regulation 3

Damp and mould: whose fault is it?

gov.wales says

sufficient means of ventilation to cope with moisture from normal domestic activities without the need to open windows that could lead to heat loss, noise and security risks

gov.wales, Fitness of homes for human habitation: guidance for landlords

gov.wales says

Where there is disagreement, the contract-holder can seek advice from Citizens Advice or Shelter Cymru or possibly their local council. These bodies would be able to contact the landlord on your behalf to discuss the issue.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

It is essential that all landlords act without delay when issues of damp and mould, as well as other hazards, are reported.

gov.wales, Written Statement: Welsh Housing Quality Standard – Responding to Hazards

gov.wales says

In many instances a landlord and a contract-holder will be able to agree where a dwelling is obviously unfit for human habitation, for example where no smoke alarm is present, no PIT has been carried out or possibly where there is significant mould present due to damp. However, there will be instances where the landlord disagrees with the contract-holder over the condition of the dwelling and no agreement can be reached. It may also be the case that the landlord believes the dwelling is unfit for human habitation for one of the following reasons:
  • The contract-holder was responsible for the dwelling becoming unfit for human habitation, for example by removing smoke alarms or through the damage they have caused to the dwelling.
  • The dwelling is unfit for human habitation because of fire, storm, flood or other inevitable accident.
  • The dwelling cannot be made FFHH at a reasonable expense. This means that although the dwelling is unfit for human habitation the required repairs would be too expensive for the landlord to carry out. If the contract-holder and landlord do not agree on this, the contract-holder can ask the court to decide the matter.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

Includes:
  • house dust mites
  • mould or fungal growth
Both are caused by dampness and/or high humidity.

gov.wales, Fitness of homes for human habitation: guidance for landlords

gov.wales says

Both are related directly to dampness which is caused by:
  • reduced ventilation levels
  • increased humidity, especially beyond 70 per cent
  • warmer indoor temperatures in winter because of dwelling design in renovated houses.

gov.wales, Fitness of homes for human habitation: guidance for landlords

gov.wales says

Potential landlord actions
  • damp proof courses, membranes and detailing around doors and window openings
  • external fabric kept in good repair to avoid rain penetration
  • frost protection for pipes and tanks
  • properly installed baths, sinks etc., with
  • properly installed drainage
  • properly installed and maintained rainwater goods
  • properly ventilated roof and under floor spaces to ensure timber remains air dry
  • adequate extraction of moisture laden air during peak times, such as cooking, bathing and laundry
  • continuous low-level background ventilation where necessary
...
  • appropriate ventilation for dwellings of high occupant density

gov.wales, Fitness of homes for human habitation: guidance for landlords

gov.wales says

If most of the conditions above are met then raising indoor temperatures, taking into account energy efficiency and cost of heating, can significantly reduce dust mite problems. So an efficient heating system appropriate for the fabric (thermal properties) of the building is important.

gov.wales, Fitness of homes for human habitation: guidance for landlords

gov.wales says

Preventive measures are particularly important here because of the likelihood of occupants having to be more confined to one or two areas; thus making them more vulnerable to any dampness etc., that might be present.

gov.wales, Fitness of homes for human habitation: guidance for landlords

gov.wales says

All landlords are reminded of their legal duty under the Renting Homes (Wales) Act 2016 to ensure homes are fit for human habitation. This includes addressing issues such as damp and mould promptly and effectively. Failure to do so is not only a breach of statutory obligations but a failure of duty to tenants.

gov.wales, Written Statement: Welsh Housing Quality Standard – Responding to Hazards

ExceptionRenting Homes (Wales) Act 2016, section 96(2) and (3)

Exception

(2) The landlord is not obliged by section 92(1) or (2) to carry out works or repairs if the disrepair, or the failure of a service installation to be in working order, is wholly or mainly attributable to lack of care by the contract-holder or a permitted occupier of the dwelling. (3) “ Lack of care ” means a failure to take proper care— (a) of the dwelling, or (b) if the dwelling forms part only of a building, of the common parts that the contract-holder is entitled to use under the occupation contract.

Renting Homes (Wales) Act 2016, section 96(2) and (3)

The law says

Section 91(1) does not impose any liability on the landlord if the dwelling is unfit for human habitation wholly or mainly because of an act or omission (including an act or omission amounting to lack of care) of the contract-holder or a permitted occupier of the dwelling.

Renting Homes (Wales) Act 2016, section 96(1)

The law says

(1) The contract-holder under an occupation contract is not liable for waste in respect of the dwelling.
  • (2) The rule of law under which a tenant has an implied duty to use demised premises in a tenant-like manner does not apply to a contract-holder if the tenancy is an occupation contract.

Renting Homes (Wales) Act 2016, section 101

How do I tell my landlord, and how long do they have?

gov.wales says

it would be reasonable for a contract-holder to expect a burst pipe or broken boiler to be considered an urgent repair and dealt with quickly, but a dripping tap to be considered less urgent

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

It may be easy for the contract-holder to identify if one of the 29 matters and circumstances is causing a problem in the dwelling, for example where significant mould is present in bedroom due to damp coming through the walls, or the boiler is unable to produce sufficient heat in the winter months. However, there may be times where a contract-holder is unsure whether a particular problem means their home is unfit for human habitation. In all cases, a contract-holder should raise these concerns with the landlord first. If the landlord agrees, they should take action to solve the problem.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

It is beneficial for both the contract-holder and landlord that issues of disrepair are reported and dealt with as quickly as possible, as this will prevent the problem getting worse and causing greater problems.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

Ministry of Justice says

Tenants must allow the landlord reasonable access for inspection and the carrying out of works in accordance with the tenancy agreement. The landlord should give reasonable notice of the need for access, except in the case of an emergency. The landlord must give access to common parts as appropriate, for example, for the inspection of a shared heating system. If the tenant is no longer in occupation of the premises, the landlord should take all reasonable steps to give access to the tenant for the purpose of an inspection.

Pre-Action Protocol for Housing Disrepair Cases (Wales), paragraph 7.6

ExceptionRenting Homes (Wales) Act 2016, section 98(3) and (4)

Exception

(3) Subsection (4) applies where— (a) the dwelling forms part only of a building, and (b) in order to comply with section 91 or 92 the landlord needs to carry out works or repairs in another part of the building. (4) The landlord is not liable for failing to comply with section 91 or 92 if the landlord does not have sufficient rights over that other part of the building to be able to carry out the works or repairs, and was unable to obtain such rights after making a reasonable effort to do so.

Renting Homes (Wales) Act 2016, section 98(3) and (4)

The law says

The landlord's obligations under sections 91(1)(b) and 92(1) and (2) do not arise until the landlord (or in the case of joint landlords, any one of them) becomes aware that works or repairs are necessary.

Renting Homes (Wales) Act 2016, section 97(1)

The law says

The landlord complies with the obligations under those provisions if the landlord carries out the necessary works or repairs within a reasonable time after the day on which the landlord becomes aware that they are necessary.

Renting Homes (Wales) Act 2016, section 97(2)

The law says

"The landlord may enter the dwelling at any reasonable time for the purpose of -
  • (a) inspecting its condition and state of repair, or
  • (b) carrying out works or repairs needed in order to comply with section 91 or 92."
and "The landlord must give at least 24 hours' notice to the contract-holder before exercising that right."

Renting Homes (Wales) Act 2016, section 98

The law says

(3) Subsection (4) applies if—
  • (a) the landlord (the “old landlord”) transfers the old landlord's interest in the dwelling to another person (the “new landlord”), and
  • (b) the old landlord (or where two or more persons jointly constitute the old landlord, any one of them) is aware before the date of the transfer that works or repairs are necessary in order to comply with section 91(1) or 92(1) or (2).
  • (4) The new landlord is to be treated as becoming aware of the need for those works or repairs on the date of the transfer, but not before.

Renting Homes (Wales) Act 2016, section 97(3) and (4)

What about rent, and going to court?

Official sources say different things about this

gov.wales says

Occupation contracts will usually contain a term which states that a contract-holder is not required to pay rent in respect of any day or part day during which the dwelling is unfit for human habitation

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

Landlords must make sure homes are safe to live in. For example by fitting working smoke and carbon monoxide alarms and having an electrical safety test done. Rent will not be payable for any period during which the property is not fit for human habitation. You should first raise any concerns with your landlord and continue to pay rent. If there is a dispute it is ultimately for the Court to decide if your landlord has complied with the fitness obligation and you may be required to pay back any rent owed.

gov.wales, Tenants: housing law has changed (Renting Homes)

gov.wales, Tenants: housing law has changed (Renting Homes) says "Rent will not be payable for any period during which the property is not fit for human habitation.". gov.wales, Fitness for human habitation: guidance for tenants (contract-holders) says "Occupation contracts will usually contain a term which states that a contract-holder is not required to pay rent in respect of any day or part day during which the dwelling is unfit for human habitation".

gov.wales says

"A landlord and ultimately a court may not agree the property is unfit for human habitation." and "it would be advisable to set the rent aside until the issue has been resolved, either through agreement with the landlord or through the court."

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

"A contract-holder may ask the court to decide whether the dwelling is FFHH." and "If the court agrees the dwelling is unfit for human habitation, they will be able to order the landlord to repair or correct the cause of the problem. In addition, section 99 of the Act, allows a contract-holder to apply for damages or for any injury caused by the problem."

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

A contract-holder should consider carefully whether withholding rent is the right thing to do. ... Consequently, the contract-holder may find themselves in rent arrears and possibly subject to possession proceedings.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

If a contract-holder (tenant) is in receipt of Housing Benefit or the housing element of Universal Credit, they should seek advice on the potential impact of choosing not to pay rent on the benefit they receive, as this may affect benefit payments. Your benefit office, Shelter Cymru and Citizens Advice can provide assistance with housing issues, and Money Helper can provide free and impartial help with money.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

If you believe that your property is unfit but your landlord does not agree, it would ultimately be for the court to decide whether a property is unfit based on the Regulations. A court claim would be made the same way as a disrepair claim currently. However, if you withheld rent on the basis the property was unfit, this could potentially create a ground for possession - either the breach of contract ground or the serious rent arrears ground.

gov.wales, Renting homes: frequently asked questions (tenants)

gov.wales says

This may require the contract-holder to provide evidence to the court, possibly in the form of an expert such as a builder or surveyor to confirm the dwelling is unfit for human habitation. Again, advice from a local authority, Citizens Advice or Shelter Cymru will be beneficial here. Your local county court will also be able to provide advice on the correct process to follow.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

Ministry of Justice says

1.1 This Protocol applies to residential property situated in Wales. It relates to claims by tenants and others in respect of housing disrepair. Before using the Protocol tenants should ensure that their landlord is aware of the disrepair. The Protocol is intended for those cases where, despite the landlord’s knowledge of the disrepair, the matter remains unresolved.

Pre-Action Protocol for Housing Disrepair Cases (Wales), paragraph 1.1

Ministry of Justice says

1.3 If a claim proceeds to litigation, the court will expect all parties to have complied with the Protocol as far as possible. The court has power to order parties who have unreasonably failed to comply with the Protocol to pay costs or to be subject to other sanctions.

Pre-Action Protocol for Housing Disrepair Cases (Wales), paragraph 1.3

Ministry of Justice says

2.1 The aims of this Protocol are to— (a) avoid unnecessary litigation; (b) promote the speedy and appropriate carrying out of any remedial works which are the landlord’s responsibility; (c) ensure that tenants receive any compensation to which they are entitled as speedily as possible; (d) promote good pre-litigation practice, including the early exchange of information; (e) give guidance about the instruction of experts; and (f) keep the costs of resolving disputes down.

Pre-Action Protocol for Housing Disrepair Cases (Wales), paragraph 2.1

Ministry of Justice says

5.2 The tenant should send to the landlord a Letter of Claim at the earliest reasonable opportunity. A specimen Letter of Claim is at Annex A. The letter may be suitably adapted as appropriate. The Letter of Claim should contain the following details– (a) the tenant’s name, the address of the property, the tenant’s address if different, the tenant’s telephone number and when access is available; (b) details of the defects, including any defects outstanding, in the form of a schedule, if appropriate (See Annex C for a specimen schedule of conditions which can be used to inform the landlord of the defects); (c) history of the defects, including any attempts to rectify them; (d) details of any notification previously given to the landlord of the poor housing conditions or information as to why the tenant believes that the landlord has knowledge of those conditions; (e) the effect of the defects on the tenant (including any personal injury claim by the tenant); (f) the identities of all other persons who plan to make a personal injury claim and brief details of their personal injury claims; (g) the details of any special damages (see the form at Annex D); (h) the proposed expert (see paragraph 7); (i) the proposed letter of instruction to the expert (see Annex B); and (j) relevant documents disclosed by the tenant.

Pre-Action Protocol for Housing Disrepair Cases (Wales), paragraph 5.2

Ministry of Justice says

6.2 The landlord should normally reply to the Letter of Claim within 20 working days of receipt. Receipt is deemed to have taken place two days after the date of the letter. ... 6.4 Failure to respond within 20 working days of receipt of the Letter of Claim or at all, is a breach of the Protocol (see paragraph 1.3) and the tenant is then free to issue proceedings.

Pre-Action Protocol for Housing Disrepair Cases (Wales), paragraphs 6.2 and 6.4

Ministry of Justice says

6.3 The landlord must also provide a response dealing with the issues set out below, as appropriate. This can be provided either within the response to the Letter of Claim or within 20 working days of receipt of the report of the single joint expert or receipt of the experts’ agreed schedule following a joint inspection— (a) whether liability is admitted and, if so, in respect of which defects; (b) if liability is disputed in respect of some or all of the defects, the reasons for this; (c) any point which the landlord wishes to make regarding lack of notice of the defects or any difficulty in gaining access; (d) a full schedule of intended works, including anticipated start and completion dates and a timetable for the works; (e) any offer of compensation; and (f) any offer in respect of costs.

Pre-Action Protocol for Housing Disrepair Cases (Wales), paragraph 6.3

Ministry of Justice says

7.5 The Protocol does not prevent a tenant from instructing an expert at an earlier stage if this is considered necessary for reasons of urgency. Appropriate cases may include– (a) where the tenant reasonably considers that there is a significant risk to health and safety; (b) where the tenant is seeking an interim injunction; or (c) where it is necessary to preserve evidence.

Pre-Action Protocol for Housing Disrepair Cases (Wales), paragraph 7.5

Ministry of Justice says

(a) There are statutory time limits for starting proceedings (‘the limitation period’). If a tenant starts a claim after the limitation period applicable to that type of claim has expired, the landlord will be entitled to use that as a defence to the claim. In cases where the limitation period is about to expire, the tenant should ask the landlord to agree not to rely on a limitation defence, so that the parties can comply with the Protocol.

Pre-Action Protocol for Housing Disrepair Cases (Wales), paragraph 10

The law says

(1) The small claims track is the normal track for— ... (c)in relation to claims under the Renting Homes (Wales) Act 2016(1), any claim which includes a claim by a contract-holder of a dwelling against a landlord where— (i)the contract holder is seeking an order requiring the landlord to carry out repairs or other work to the dwelling (whether or not the contract-holder is also seeking some other remedy); (ii)the cost of repairs or other work to the dwelling is estimated to be not more than £1,000; and (iii)the value of any other claim for damages is not more than £1,000.

Civil Procedure Rules, rule 26.9

The law says

(1) In any proceedings for breach of a repairing obligation under an occupation contract, the court may order specific performance of the obligation despite any equitable rule limiting the availability of that remedy.
  • (2) Repairing obligations are—
  • (a) obligations to repair (or keep or deliver up in repair), or to maintain, renew, construct or replace any property, and
  • (b) obligations to keep any dwelling fit for human habitation however expressed,
and include a landlord's obligations under sections 91 and 92.

Renting Homes (Wales) Act 2016, section 100

The law says

(1) A permitted occupier who suffers personal injury, or loss of or damage to personal property, as a result of the landlord failing to comply with section 91 or 92 may enforce the section in question in his or her own right by bringing proceedings in respect of the injury, loss or damage.
  • (2) But a permitted occupier who is a lodger or sub-holder may do so only if the lodger is allowed to live in the dwelling, or the sub-occupation contract is made, in accordance with the occupation contract.

Renting Homes (Wales) Act 2016, section 99

Council and housing association homes: what are the hazard time limits?

gov.wales says

"All Housing Health and Safety Rating System (“HHSRS”) Hazards" ... "except overcrowding), which present a potential significant risk to the tenant or occupier and where the hazard results from building component defects or disrepair within the landlord's control, must be investigated and remedied within the timescales set out in the rule." and "Damp and mould growth"

gov.wales, WHQS Addendum: responding to hazards

gov.wales says

A hazard which may present a significant risk with an assessed likelihood of imminent harm to the tenant/occupier must be investigated within 24 hours and remedied within a further 24 hours.

gov.wales, WHQS Addendum: responding to hazards

gov.wales says

A hazard which may present a significant risk with no assessed likelihood of imminent harm will be investigated within 10 working days and remedied within a further 5 working day period.

gov.wales, WHQS Addendum: responding to hazards

gov.wales says

On occasion and on the assumption of best endeavours, it will not be possible to remedy a hazard within the timescales above. In this case, a written summary plan must be provided to the tenant (hard copy or electronic) within 5 working days.

gov.wales, WHQS Addendum: responding to hazards

gov.wales says

The element, rule, guidance and associated reporting will come into effect from 01 April 2026

gov.wales, WHQS Addendum: responding to hazards

gov.wales says

While these provisions focus on the social housing sector, it is equally important to consider how we can protect tenants and occupiers in the private sector from undue risk posed by hazards.

gov.wales, Written Statement: Welsh Housing Quality Standard – Responding to Hazards

gov.wales says

Any work to make safe should be carried out as soon as possible in any event.

gov.wales, WHQS Addendum: responding to hazards

gov.wales says

The content of the summary plan is set out in the published statutory guidance.

gov.wales, WHQS Addendum: responding to hazards

gov.wales says

The requirement to comply with the rule will be limited to where a significant risk is assessed. A ‘significant risk’ is one that poses a significant risk of harm to the health or safety of a tenant/occupant, specifically, a significant risk of harm is defined as a risk of harm to the occupier’s health or safety that a competent member of the landlord’s workforce with the relevant knowledge would take steps to make safe as a matter of urgency.

gov.wales, WHQS Addendum: responding to hazards

gov.wales says

In assessing a significant risk and imminent harm, landlords must take into account
  • the tenants and other occupiers individual circumstances including age, any physical and/or mental health issues and any other vulnerabilities.
  • the condition of the home.
  • the nature of the hazard (likelihood of harm materialising and the potential severity of that harm in the specific circumstances).

gov.wales, WHQS Addendum: responding to hazards

gov.wales says

If applicable, the written Summary plan must include the following information as a minimum:
  • Confirmation of the nature of the hazard identified and whether it has been assessed as presenting imminent harm or not.
  • The action has been taken/will be taken to make the property safe.
  • Details of the work to be undertaken to remedy the hazard.
  • When the work is likely to start and finish.
  • Detail of the arrangements made to mitigate any risks to the tenant occupier in the interim.
  • How to contact the landlord – an individual should be named with a direct contact email/Tel no.

gov.wales, WHQS Addendum: responding to hazards

gov.wales says

A summary report can be provided to the tenant in hardcopy or email/electronic means, but the issue of the summary must be properly recorded in the landlords’ records.

gov.wales, WHQS Addendum: responding to hazards

gov.wales says

These measures are not optional; they are designed to strengthen accountability and transparency across the sector. Social landlords must now publish response times and report on their performance as part of the WHQS compliance return, ensuring tenants can see how their landlord is meeting obligations.

gov.wales, Written Statement: Welsh Housing Quality Standard – Responding to Hazards

What about alarms and electrical safety?

gov.wales says

A landlord is not required to install a CO alarm in any room which only contains an appliance installed by the contract-holder.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

A copy of the EICR must be made available to the contract-holder within 14 days of the occupation date. If the test is carried out after the occupation date a copy of the EICR must be provided within 14 days of the inspection date.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

Where a landlord fails to do any of the above, in the times allowed, the dwelling will be unfit for human habitation.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

Part 2 of the regulations sets out 3 things a landlord must do to ensure a home is FFHH:
  • Install smoke alarms;
  • Carry out an electrical safety test at least every 5 years; and
  • Install carbon monoxide alarms where a gas, oil or solid fuel appliance is present.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

The presence of smoke alarms is intended to reduce the risk of fire. Without a smoke alarm fitted an occupier is at least 4 times more likely to die because of fire. The FFHH Regulations require a landlord to fit a working smoke alarm on every storey of a dwelling. The alarm must also be connected to the electrical supply and be linked to any other smoke alarms that have to be fitted under the regulations. Smoke alarms should be fitted where they can be heard by the occupier when asleep, usually a hall or landing area. More than one smoke alarm may be fitted on each storey. If so, it is good to have all alarms inter-linked and hard-wired into the electrical supply. However, if the landlord has met the minimum requirement of one hard-wired and inter-linked smoke alarm on each storey, any additional alarms do not have to be inter-linked and can be battery powered. Smoke alarms must be present from the occupation date, that is the date the contract-holder moves in.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

A landlord must note the manufacturer’s recommended life span of a fire alarm, which will depend on the alarm. An alarm which has passed its expiry date may not be fully operational and incapable of detecting smoke.

gov.wales, Fitness of homes for human habitation: guidance for landlords

gov.wales says

Carbon monoxide (CO) is a gas, produced when carbon-based fuel, such as coal, wood, oil or natural gas, is burnt without enough oxygen. You cannot see, smell or taste it but it can injure and kill quickly. Not only is CO responsible for many deaths and poisonings each year, but many people are also likely to be affected by CO without realising it. Alarms are essential in providing perhaps the only warning an occupier will have of the presence of CO, which is a ‘silent killer’ and almost every fatality results from the lack of early warning to its presence. Oil and gas boilers, gas and open fires, and heaters and stoves fuelled by solid fuel, oil or gas, all have the potential to cause CO poisoning if they are poorly installed, poorly maintained or incorrectly used. This is more often because there is no proper ventilation for these appliances, or the flues or chimneys required to take the CO away are not fitted properly or are blocked.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

The FFHH Regulations require a landlord to ensure that a CO alarm is present in any room which has a gas, oil or solid fuel burning appliance installed by the landlord. ... However, the landlord and contract-holder can agree for the landlord to provide an alarm in such instances.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

The placement of CO alarms should be considered carefully. Smoke alarms are normally placed on the ceiling because heat and smoke rise, but this is not always the best place to install CO detectors. Since the concentration of CO could reach dangerous levels before reaching ceiling height, CO alarms are sometimes installed lower than smoke alarms. The guidance accompanying carbon monoxide alarms should always be followed carefully, including noting the expiry date of the alarm. CO sensors are usually more fragile than those within smoke alarms and so CO alarms generally need to be replaced more regularly.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

The Regulations do not stipulate whether the carbon monoxide alarms should be battery powered or connected to the dwelling’s electrical supply.

gov.wales, Renting homes: frequently asked questions (landlords)

gov.wales says

Therefore, whilst it is not a requirement that every smoke alarm at a property is connected to the dwelling’s electrical supply, at least one smoke alarm on each storey of the dwelling must be. Provided that this requirement is met there is nothing to prevent additional battery powered alarms from being fitted, which (as they are not hardwired) do not have to be interlinked.

gov.wales, Renting homes: frequently asked questions (landlords)

gov.wales says

The requirement for a landlord to ensure that smoke alarms and carbon monoxide alarms are present under these Regulations does not replace any duties placed on a landlord under existing legislation, including the Management of Houses in Multiple Occupation (Wales) Regulations 2006 and the Gas Safety (Installation and Use) Regulations 1998.

gov.wales, Fitness of homes for human habitation: guidance for landlords

gov.wales says

Although fires in the home are reducing overall, the proportion of domestic fires caused by electricity is steadily increasing. To prevent electrical fires and shocks a landlord must test the electrics in your home at least every 5 years. This test is known as ‘periodic inspection and testing’ (PIT). PIT is carried out on wiring and fixed electrical equipment to check that they are safe. The test will:
  • Reveal if any of your electrical circuits or equipment is overloaded;
  • Find any potential electric shock risks and fire hazards;
  • Identify any defective electrical work and
  • Highlight any lack of earthing or bonding.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

A landlord must ensure the PIT is carried out at least every 5 years. The PIT must be done by someone qualified to do so - a ‘competent person’. Competence means the electrician can undertake the PIT safely and accurately in accordance with the UK standard for the safety of electrical installations, BS 7671 – Requirements for Electrical Installations (IET Wiring Regulations). If a contract-holder has concerns about the competency of the person carrying out the test they should ask their landlord what checks they have carried out to ensure the person is competent. A contract-holder can also ask the electrician what qualifications or accreditation they hold.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

Once the PIT has been completed an Electrical Installation Condition Report (EICR) will be produced by the electrician. This report contains the results from the test and highlight any issues that need fixing. If no such issues are found the EICR will confirm the electrical installation is safe for continued use.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

A contract-holder may be provided an EICR directly by the electrician upon completion of the test. A landlord is required to have the electrical installation of the dwelling tested every 5 years. However, where there are concerns the electrician may recommend that this test is carried out at shorter intervals. Where a shorter interval is recommended the 5-year period will no longer apply and a landlord must ensure that a future test is undertaken at the recommended interval. Failure to do so will mean the dwelling is considered unfit for human habitation.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

There may be instances when the electrical installation has failed the test and the EICR requires repairs to be undertaken or future investigation by an electrician is required. In such instances it is likely the landlord is failing in their duty to keep the electrical installation in good repair (required by section 92 of the Act - see later in this guidance) and they will be required to carry out these repairs or further investigation. Where this additional work is required by an EICR, a landlord must provide the contract-holder with written confirmation of any repairs or investigatory work carried out on the electrical installation. This confirmation will provide the contract-holder with an assurance that the electrical installation is safe for continued use following a failed inspection. Written confirmation of this additional work must be provided to the contract-holder within 14 days of the landlord receiving confirmation of the completed work. Where repairs have been undertaken prior to the occupation date, this written confirmation must be provided to the contract-holder, alongside the EICR, within 14 days of the occupation date.

gov.wales, Fitness for human habitation: guidance for tenants (contract-holders)

gov.wales says

An EICR (or an Electrical Installation Certificate covering the whole of a newly built dwelling ... ) satisfies the definition of an ‘electrical condition report’ required under Regulation 6 of the FFHH regulations. The EICR will inform you of any deterioration, defects, dangerous conditions and any non-compliance with the present-day safety standard that might give rise to danger.

gov.wales, Fitness of homes for human habitation: guidance for landlords

The law says

on each storey of the dwelling there is a smoke alarm which is -
  • (a) in repair and proper working order,
  • (b) connected to the dwelling's electrical supply, and
  • (c) linked to every other smoke alarm in the dwelling which is connected to the electrical supply.

Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022, regulation 5(1)

The law says

a carbon monoxide alarm which is in repair and proper working order is in each room of the dwelling which contains a gas appliance, an oil-fired combustion appliance or a solid fuel burning combustion appliance.

Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022, regulation 5(2)

The law says

The landlord must ensure that there is a valid electrical condition report in respect of the dwelling during each period of occupation.

Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022, regulation 6(1)

The law says

A dwelling is to be treated as unfit for human habitation at a time when the landlord is not in compliance with a requirement imposed by paragraph (1) or (2).

Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022, regulation 5(3)

The law says

(4) For the purposes of paragraph (3), a landlord who has not complied with—
  • (a) paragraph (1) is to be treated as in compliance with that paragraph from the time the landlord ensures that a smoke alarm is (or smoke alarms are) present in the dwelling as described in that paragraph;
  • (b) paragraph (2) is to be treated as in compliance with that paragraph from the time the landlord ensures that a carbon monoxide alarm is (or carbon monoxide alarms are) present in the dwelling as described in that paragraph.

Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022, regulation 5(4)

The law says

(5) In this regulation—
  • “ gas ” (“ nwy ”) has the meaning given by section 48(1) of the Gas Act 1986 ;
  • “ gas appliance ” (“ cyfarpar nwy ”) means an appliance designed for use by a consumer of gas for heating, lighting, cooking or other purposes for which gas can be used, but it does not include—
  • a portable or mobile appliance supplied with gas from a cylinder, or the cylinder, pipes and other fittings used for supplying gas to that appliance, or
  • an appliance which the contract-holder is entitled to remove from the dwelling under the terms of the occupation contract;
  • “ room ” ( “ystafell ”) includes a hall, landing or corridor.

Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022, regulation 5(5)

The law says

(2) An electrical condition report—
  • (a) is a condition report setting out the results of an electrical safety inspection carried out by a qualified person;
  • (b) is valid—
  • (i) until the end of the period of 5 years beginning with the day on which the electrical safety inspection is carried out (“the inspection date”), or
  • (ii) if the electrical condition report states that the next electrical safety inspection should be carried out less than 5 years after the inspection date, until the end of the day by which, in accordance with the report, the next electrical safety inspection should be carried out.

Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022, regulation 6(2)

The law says

(3) The landlord must ensure that the contract-holder is, before the end of the period of 14 days starting with the occupation date, given—
  • (a) a copy of the most recent electrical condition report, and
  • (b) where investigatory or remedial work has been carried out on or in relation to an electrical service installation in the dwelling after the electrical safety inspection to which that report relates (and before the occupation date), written confirmation of work.

Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022, regulation 6(3)

The law says

(4) Where an electrical safety inspection is carried out after the occupation date, the landlord must ensure that the contract-holder is given a copy of the electrical condition report relating to the inspection before the end of the period of 14 days starting with the day on which the inspection was completed.

Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022, regulation 6(4)

The law says

(5) Where investigatory or remedial work is carried out on or in relation to an electrical service installation in the dwelling after the occupation date, the landlord must ensure that the contract-holder is given written confirmation of work before the end of the period of 14 days starting with the day on which the landlord received the confirmation.

Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022, regulation 6(5)

The law says

(6) A dwelling is to be treated as unfit for human habitation at a time when the landlord is not in compliance with a requirement imposed by this regulation.

Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022, regulation 6(6)

The law says

For the purposes of regulation 6(1), it does not matter if the valid electrical condition report was obtained before these Regulations came into force.

Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022, regulation 8

What are the gas safety rules?

GOV.UK says

"call the National Gas Emergency Service immediately on 0800 111 999" and "24 hours a day – free to call"

GOV.UK, Awaab's Law: Guidance for tenants in social housing

HSE says

You must ensure that any gas appliances (permanent or portable), and gas flues that you own and provide for use by your tenants have regular gas safety checks.

HSE, Gas safety checks - who needs them?

HSE says

You must ensure that a gas safety check is done every year on each gas appliance/flue. Before any new lease starts, you must make sure that these checks have been done within one year before the start of the lease date.

HSE, Gas safety checks - who needs them?

HSE says

Landlords must take prompt action to correct any defect shown on the safety check record, if it wasn't rectified at the time of the safety check. Where there is any suspicion that an appliance may be dangerous/unsafe, the landlord or other responsible person for the premises (eg agent) should ensure that the appliance concerned is not used until the defect(s) have been remedied.

HSE, Gas safety checks - who needs them?

HSE says

If your tenant is happy and can access it, you can provide their copy of the gas safety check record electronically. But you must give them a paper copy if they ask for it.

HSE, Dealing with tenants

HSE says

The contract you make with your tenant should allow you access for any maintenance or safety check work that needs to be done. You must not use force to enter the property. ... A landlord has to show that they took all reasonable steps to comply with the law. HSE recommends the following actions and strongly advises that a record be kept of all correspondence with the tenants:
  • leave the tenant a notice stating that an attempt was made to complete the gas safety check and provide your contact details;
  • write to the tenant explaining that a safety check is a legal requirement and that it is for the tenant's own safety. Give the tenant the opportunity to arrange their own appointment;
  • HSE inspectors will look for repeated attempts to complete the gas safety check, including the above suggestions; however the approach will need to be appropriate to each circumstance. It would ultimately be for a court to decide if the action taken was reasonable depending upon the individual circumstances.

HSE, Dealing with tenants

HSE says

Your tenant has a duty not to use an appliance they believe to be dangerous. Further, a tenancy agreement, such as a full repairing and insuring lease, cannot be used to transfer these responsibilities to a tenant.

HSE, Dealing with tenants

HSE says

Tenants are responsible for the gas safety checks of their own appliances and the flue if the flue only services their appliance.

HSE, Dealing with tenants

HSE says

If a heating appliance has been disconnected, you must provide the tenant with emergency heating, while arranging for appropriate remedial work by a Gas Safe registered engineer. If a gas appliance has been switched off by a Gas Safe registered engineer, it is because it was unsafe and should not be used. No matter how inconvenient this is, it ensures your tenant's safety.

HSE, Dealing with tenants

HSE says

Landlords are responsible for repairs required as a result of general wear and tear.

HSE, Maintenance - gas appliances and flues

HSE says

All maintenance checks and repairs must be done by a Gas Safe registered engineer.

HSE, Maintenance - gas appliances and flues

The law says

ensure that each appliance and flue to which that duty extends is checked for safety within 12 months of being installed and at intervals of not more than 12 months since it was last checked for safety

Gas Safety (Installation and Use) Regulations 1998, regulation 36(3)(a)

The law says

"is given to each existing tenant of premises to which the record relates within 28 days of the date of the check" and "is given to any new tenant of premises to which the record relates before that tenant occupies those premises"

Gas Safety (Installation and Use) Regulations 1998, regulation 36(6)

The law says

(2) Every landlord shall ensure that there is maintained in a safe condition—
  • (a) any relevant gas fitting; and
  • (b) any flue which serves any relevant gas fitting,
so as to prevent the risk of injury to any person in lawful occupation or relevant premises.

Gas Safety (Installation and Use) Regulations 1998, regulation 36(2)

The law says

(4) Every landlord shall ensure that any work in relation to a relevant gas fitting or any check of a gas appliance or flue carried out pursuant to paragraphs (2) or (3) above is carried out by, or by an employee of, a member of a class of persons approved for the time being by the Health and Safety Executive for the purposes of regulation 3(3) of these Regulations.

Gas Safety (Installation and Use) Regulations 1998, regulation 36(4)

What if my landlord tries to evict me for asking?

gov.wales says

If your landlord issues you with a no-fault notice just because you have complained your home is in a poor state of repair, the Court will not have to grant possession to the landlord. You can therefore seek a repair without worrying your home will be at risk.

gov.wales, Tenants: housing law has changed (Renting Homes)

gov.wales says

The new law places an obligation on the landlord to ensure the dwelling is fit for human habitation. Regulations set out further information on the fitness for human habitation requirement. A contract-holder will not be liable to pay rent for any period during which the property is deemed to be unfit, and a landlord will not be able to issue a Landlord’s Notice, or break clause if they are not in compliance with the Fitness requirements.

gov.wales, Renting homes: frequently asked questions (landlords)

The law says

(2) The landlord may not impose any obligation on the contract-holder in the event of the contract-holder's enforcing or relying on the landlord's obligations under section 91 or 92.

Renting Homes (Wales) Act 2016, section 93(2)

The law says

(2) A landlord may not give notice at a time when—
  • (a) the dwelling is treated as unfit for human habitation by virtue of regulation 5(3) of the Fitness for Human Habitation Regulations (failure to ensure that working smoke alarms and, in certain circumstances, carbon monoxide alarms are installed in a dwelling), and
  • (b) as a result, the landlord is required under Part 4 of this Act to take steps to stop the dwelling from being treated as unfit for human habitation by virtue of that regulation.

Renting Homes (Wales) Act 2016, Schedule 9A, paragraph 5A(2)

The law says

(2) A landlord may not give notice at a time when—
  • (a) the dwelling is treated as unfit for human habitation by virtue of regulation 6(6) of the Fitness for Human Habitation Regulations (failure to obtain an electrical condition report, or to give the contract holder such a report or written confirmation of certain other electrical work), and
  • (b) as a result, the landlord is required under Part 4 of this Act to take steps to stop the dwelling from being treated as unfit for human habitation by virtue of that regulation.

Renting Homes (Wales) Act 2016, Schedule 9A, paragraph 5B(2)

The law says

(2) A landlord may not give notice at a time when the landlord has not complied with regulation 36(6) or (as the case may be) (7) of the Gas Safety Regulations (requirement to provide or display report on safety etc. of gas installations).

Renting Homes (Wales) Act 2016, Schedule 9A, paragraph 5C(2)

The law says

"the contract-holder has enforced or relied on the landlord's obligations under section 91 or 92, and
  • (b) the court is satisfied that the landlord has made the possession claim to avoid complying with those obligations."
and "The court may refuse to make an order for possession."

Renting Homes (Wales) Act 2016, section 217

The law says

The landlord may not give another notice under section 173 to the contract-holder before the end of the period of six months starting with the day on which the court refused to make an order for possession.

Renting Homes (Wales) Act 2016, section 177A(2)

Where to get help

Shelter Cymru: 08000 495 495. Free advice on urgent housing problems in Wales.

Citizens Advice: 0800 702 2020 (Advicelink Wales).

Ways to contact Citizens Advice in Wales

  • Advicelink: 0800 702 2020. Monday to Friday 8am to 7pm, Saturday 9am to 1pm, not on public holidays. Free from mobiles and landlines. At busy times you might wait up to an hour.
  • Cannot hear or speak on the phone: Relay UK. Dial 18001 then 0800 702 2020, using the app or a textphone. There's no extra charge.
  • Online chat with an adviser: usually Monday to Friday, 9am to 5pm.
  • Your local Citizens Advice: search by postcode or town on the Citizens Advice website.

Your council: can contact your landlord about a home that is unfit. Find your local council.

National Gas Emergency Service: 0800 111 999 (GOV.UK, read 17 Nov 2026), if you smell gas or think there is carbon monoxide.

Related guides

Sources

Quotes from legislation, gov.wales, GOV.UK, HSE and the Ministry of Justice contain public sector information licensed under the Open Government Licence v3.0.

Important disclaimer: This guide covers repairs, damp and mould in rented homes in Wales as at 17 November 2026. It is general information, not legal advice.

Comments

Comments are loading…