📚 Guides All topics ❓ Help & FAQ How it works 📅 Key Dates Know your deadlines 📞 Helplines Free support numbers

Report an Issue

Tell us what went wrong and we'll look into it. We'll be in touch as soon as we can.

Your name and email will only be used to respond to your report. See our Privacy Policy.

Share Your Feedback

Good or bad, we'd love to hear what you think. No strings attached.

Your feedback helps us make the site better for everyone. See our Privacy Policy.

Planning permission

Planning permission for your home: England

The official words on when work on a house in England needs planning permission or building regulations approval.

Last reviewed: 27 November 2026 Sources: listed at the end England

This guide is for people in England who want to extend, alter or change the use of their home, or who have been told work needs permission. Each section shows the exact words of the law or official guidance, with a link to the page they come from.

In Wales, Scotland or Northern Ireland? Read our Wales, Scotland or Northern Ireland guide.

What counts as development that needs planning permission?

GOV.UK says

Planning permission is only needed if the work being carried out meets the statutory definition of ‘development’ which is set out in section 55 of the Town and Country Planning Act 1990. ‘Development’ includes:
  • building operations (eg structural alterations, construction, rebuilding, most demolition);
  • material changes of use of land and buildings ;
  • engineering operations (eg groundworks);
  • mining operations;
  • other operations normally undertaken by a person carrying on a business as a builder.
  • subdivision of a building (including any part it) used as a dwellinghouse for use as 2 or more separate dwelling houses
The categories of work that do not amount to ‘development’ are set out in section 55(2) of the Town and Country Planning Act 1990. These include, but are not limited to the following:
  • interior alterations (except mezzanine floors which increase the floorspace of retail premises by more than 200 square metres)
  • building operations which do not materially affect the external appearance of a building. The term ‘materially affect’ has no statutory definition, but is linked to the significance of the change which is made to a building’s external appearance.
  • a change in the primary use of land or buildings, where the before and after use falls within the same use class.

GOV.UK, When is permission required?

GOV.UK says

Section 57 of the Town and Country Planning Act 1990 directs that all operations or work falling within the statutory definition of ‘development’ require planning permission. However, there are different types of planning permission, such as:
  • local authority grants of planning permission
  • national grants of permission by the General Permitted Development Order which allows certain building works and changes of use to be carried out without having to make a planning application
  • local grants of planning permission through Local or Neighbourhood Development Orders or Community Right to Build Orders.
  • Development which is to be carried out by a local authority, national park authority or statutory undertaker that has been authorised by a relevant government department.

GOV.UK, When is permission required?

The law says

(1) Subject to the following provisions of this section, in this Act, except where the context otherwise requires, “ development, ” means the carrying out of building, engineering, mining or other operations in, on, over or under land, or the making of any material change in the use of any buildings or other land.

Town and Country Planning Act 1990, section 55(1)

The law says

(2) The following operations or uses of land shall not be taken for the purposes of this Act to involve development of the land—
  • (a) the carrying out for the maintenance, improvement or other alteration of any building of works which—
  • (i) affect only the interior of the building, or
  • (ii) do not materially affect the external appearance of the building,
and are not works for making good war damage or works begun after 5th December 1968 for the alteration of a building by providing additional space in it underground;
  • (b) the carrying out on land within the boundaries of a road by a . . . highway authority of any works required for the maintenance or improvement of the road but, in the case of any such works which are not exclusively for the maintenance of the road, not including any works which may have significant adverse effects on the environment ;
  • (c) the carrying out by a local authority or statutory undertakers of any works for the purpose of inspecting, repairing or renewing any sewers, mains, pipes, cables or other apparatus, including the breaking open of any street or other land for that purpose;
  • (d) the use of any buildings or other land within the curtilage of a dwellinghouse for any purpose incidental to the enjoyment of the dwellinghouse as such;
  • (e) the use of any land for the purposes of agriculture or forestry (including afforestation) and the use for any of those purposes of any building occupied together with land so used;
  • (f) in the case of buildings or other land which are used for a purpose of any class specified in an order made by the Secretary of State under this section, the use of the buildings or other land or, subject to the provisions of the order, of any part of the buildings or the other land, for any other purpose of the same class.
  • (g) the demolition of any description of building specified in a direction given by the Secretary of State to local planning authorities generally or to a particular local planning authority.

Town and Country Planning Act 1990, section 55(2)

The law says

(3) For the avoidance of doubt it is hereby declared that for the purposes of this section—
  • (a) the use as two or more separate dwellinghouses of any building previously used as a single dwellinghouse involves a material change in the use of the building and of each part of it which is so used;
  • (b) the deposit of refuse or waste materials on land involves a material change in its use, notwithstanding that the land is comprised in a site already used for that purpose, if—
  • (i) the superficial area of the deposit is extended, or
  • (ii) the height of the deposit is extended and exceeds the level of the land adjoining the site.

Town and Country Planning Act 1990, section 55(3)

The law says

(1) Subject to the following provisions of this section, planning permission is required for the carrying out of any development of land.

Town and Country Planning Act 1990, section 57(1)

What are permitted development rights?

GOV.UK says

Permitted development rights are a national grant of planning permission which allow certain building works and changes of use to be carried out without having to make a planning application. Permitted development rights are subject to conditions and limitations to control impacts and to protect local amenity.

GOV.UK, When is permission required?

GOV.UK says

Permitted development rights are set out in the Town and Country Planning (General Permitted Development) (England) Order 2015, as amended. Permitted development rights for householders: technical guidance has been issued by the government.

GOV.UK, When is permission required?

GOV.UK says

Permitted development rights allow householders to improve and extend their homes without the need to apply for planning permission where that would be out of proportion with the impact of works carried out.

GOV.UK, Permitted development rights for householders: technical guidance

GOV.UK says

Where a relevant permitted development right is in place, there is no need to apply to the local planning authority for permission to carry out that work. In a small number of cases, however, it may be necessary to obtain prior approval from a local planning authority before carrying out permitted development. Permitted development rights do not override the requirement to comply with other permission, regulation or consent regimes.

GOV.UK, When is permission required?

GOV.UK says

If it is not clear whether works are covered by permitted development rights, it is possible to apply for a lawful development certificate for a legally binding decision from the local planning authority.

GOV.UK, When is permission required?

GOV.UK says

There are 2 types of lawful development certificate. A local planning authority can grant a certificate confirming that: (a) an existing use of land, or some operational development, or some activity being carried out in breach of a planning condition, is lawful for planning purposes under section 191 of the Town and Country Planning Act 1990 ; or (b) a proposed use of buildings or other land, or some operations proposed to be carried out in, on, over or under land, would be lawful for planning purposes under section 192 of the Town and Country Planning Act 1990.

GOV.UK, Lawful development certificates

GOV.UK says

Anyone can apply to the local planning authority to obtain a decision on whether an existing use or development, or a proposed use or development, is lawful for planning purposes or not. If the local planning authority is satisfied that the appropriate legal tests have been met, it will grant a lawful development certificate. Where an application has been made under section 191, the statement in a lawful development certificate of what is lawful relates only to the state of affairs on the land at the date of the certificate application. The key statutory framework for such applications and their determination is set out in sections 191-193 of the Town and Country Planning Act 1990 (“the Act”). Once a certificate has been granted following an application under section 192, it means that any proposed use or development in accordance with it must be presumed as lawful, unless there is a material change before the use or development has begun (section 192(4)). Examples of such a material change include:
  • a direction under article 4 of the Town and Country Planning (General Permitted Development) (England) Order 2015 taking away the particular permitted development right relevant to the certificate; or
  • a statutory amendment to permitted development rights

GOV.UK, Lawful development certificates

GOV.UK says

The grant of a certificate applies only to the lawfulness of development in accordance with planning legislation. It does not remove the need to comply with any other legal requirements such as the Building Regulations 2010, or the Planning (Listed Buildings and Conservation Areas) Act 1990 (as amended) or other licensing or permitting schemes.

GOV.UK, Lawful development certificates

The law says

(1) Subject to the provisions of this Order and regulations 75 to 78 of the Conservation of Habitats and Species Regulations 2017 (general development orders), planning permission is hereby granted for the classes of development described as permitted development in Schedule 2.

Town and Country Planning (General Permitted Development) (England) Order 2015, article 3(1)

The law says

(2) Any permission granted by paragraph (1) is subject to any relevant exception, limitation or condition specified in Schedule 2.

Town and Country Planning (General Permitted Development) (England) Order 2015, article 3(2)

Do the same permitted development rights apply in every area?

GOV.UK says

There is a range of exclusions which apply to certain permitted development rights in England. For instance, there are protected areas known as article 2(3) land, which cover:
  • conservation areas
  • Areas of Outstanding Natural Beauty
  • National Parks
  • the Broads
  • World Heritage Sites
There are other land areas known as article 2(4) land. Article 2(4) land covers land within a National Park, the Broads or certain land outside the boundaries of a National Park.

GOV.UK, When is permission required?

GOV.UK says

Permitted development rights are subject to national conditions and limitations (for example limits on height, size or location etc). Some permitted development rights are also in place for a limited period of time; these are set out in the relevant Parts in Schedule 2 to the General Permitted Development Order. Special rules apply to permitted development rights where they relate to development specified in the Town and Country Planning (Environmental Impact Assessment) Regulations 2017. If the proposed development would fall into Schedule 1 or 2 of these regulations, it would only be permitted where a local planning authority has issued a screening opinion determining that the development is not environmental impact assessment development; or alternatively where the Secretary of State has directed that it is not environmental impact assessment development or that the development is exempt from the Environmental Impact Assessment Regulations. There are some specific exceptions to this general rule: Article 3(10) to (12) of the General Permitted Development Order provides more detail on this. Special rules also apply to permitted development rights where development could have a significant effect on a Habitats site or a European Offshore Marine Site. These are sites of the sort described in regulation 8 of the Conservation of Habitats and Species Regulations 2017, which have been designated under processes set out in those regulations. Under article 3(1) of the General Permitted Development Order and regulations 73 to 76 of the Conservation of Habitats and Species Regulations 2017, a development must not be begun or continued before the developer has received written notice of the approval of the local planning authority.

GOV.UK, When is permission required?

GOV.UK says

Permitted development rights can be removed by the local planning authority, either by means of a condition on a planning permission, or by means of an article 4 direction. The restrictions imposed will vary on a case by case basis and the specific wording of such conditions or directions.

GOV.UK, When is permission required?

GOV.UK says

Permitted development rights can be expanded via a Local Development Order or Neighbourhood Development Order, or they can be limited or withdrawn via an article 4 direction.

GOV.UK, When is permission required?

GOV.UK says

An article 4 direction is a direction under article 4 of the General Permitted Development Order which enables the Secretary of State or the local planning authority to withdraw specified permitted development rights across a defined area. An article 4 direction cannot be used to restrict changes between uses in the same use class of the Use Classes Order.

GOV.UK, When is permission required?

GOV.UK says

Provided that there is justification for both its purpose and extent, an article 4 direction can:
  • remove specified permitted development rights related to operational development or change of use
  • remove permitted development rights with temporary or permanent effect

GOV.UK, When is permission required?

GOV.UK says

An article 4 direction only means that a particular development cannot be carried out under permitted development and therefore needs a planning application. This gives a local planning authority the opportunity to consider a proposal in more detail.

GOV.UK, When is permission required?

GOV.UK says

Yes, a planning application fee may be payable. Details of planning fees are set out in the 2012 Fees Regulations, as amended.

GOV.UK, When is permission required?

GOV.UK says

It is important to note that a local planning authority is allowed to remove permitted development rights in some or all of its area by issuing what is known as an Article 4 Direction; or may have removed those rights on the original, or any subsequent, planning permission for the house. Where permitted development rights have been removed in either of these ways a planning application will be needed for development. Before undertaking any development, checks should be undertaken with the local planning authority to determine whether any such restrictions on permitted development have been made.

GOV.UK, Permitted development rights for householders: technical guidance

The law says

(3) The land referred to elsewhere in this Order as article 2(3) land is the land described in Part 1 of Schedule 1 to this Order (National Parks, areas of outstanding natural beauty and conservation areas etc).

Town and Country Planning (General Permitted Development) (England) Order 2015, article 2(3)

The law says

(1) Land within—
  • (a) an area designated as a conservation area under section 69 of the Planning (Listed Buildings and Conservation Areas) Act 1990 (designation of conservation areas);
  • (b) an area of outstanding natural beauty;
  • (c) an area specified by the Secretary of State for the purposes of section 41(3) of the Wildlife and Countryside Act 1981 (enhancement and protection of the natural beauty and amenity of the countryside) ;
  • (d) the Broads;
  • (e) a National Park; and
  • (f) a World Heritage Site.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 1, Part 1

The law says

(1) If the Secretary of State or the local planning authority is satisfied that it is expedient that development described in any Part, Class or paragraph in Schedule 2, other than Class DA of Part 4, Class CA of Part 7 or Class K, KA or M of Part 17, should not be carried out unless permission is granted for it on an application, the Secretary of State or (as the case may be) the local planning authority, may make a direction under this paragraph that the permission granted by article 3 does not apply to—
  • (a) all or any development of the Part, Class or paragraph in question in an area specified in the direction; or
  • (b) any particular development, falling within that Part, Class or paragraph, which is specified in the direction,
and the direction must specify that it is made under this paragraph.

Town and Country Planning (General Permitted Development) (England) Order 2015, article 4(1)

Can I extend my house without planning permission?

GOV.UK says

“Curtilage” - is land which forms part and parcel with the house. Usually it is the area of land within which the house sits, or to which it is attached, such as the garden, but for some houses, especially in the case of properties with large grounds, it may be a smaller area. “Enlarged part of the house” - is the enlargement which is proposed to be carried out under Class A (pages 10-32). “Total enlargement” – is the proposed enlargement together with any existing enlargement of the original dwelling house to which it will be joined. “Principal elevation” – in most cases the principal elevation will be that part of the house which fronts (directly or at an angle) the main highway serving the house (the main highway will be the one that sets the postcode for the house concerned). It will usually contain the main architectural features such as main bay windows or a porch serving the main entrance to the house. Usually, but not exclusively, the principal elevation will be what is understood to be the front of the house. There will only be one principal elevation on a house.

GOV.UK, Permitted development rights for householders: technical guidance

GOV.UK says

“Original” - means a building as it existed on 1 July 1948 where it was built before that date, and as it was built if built after that date. “Raised” - in relation to a platform means a platform with a height greater than 0.3 metres.

GOV.UK, Permitted development rights for householders: technical guidance

Condition

Development is not permitted by Class A if— (a) permission to use the dwellinghouse as a dwellinghouse has been granted only by virtue of Class G, M, MA, N, P, PA or Q of Part 3 of this Schedule (changes of use); (b) as a result of the works, the total area of ground covered by buildings within the curtilage of the dwellinghouse (other than the original dwellinghouse) would exceed 50% of the total area of the curtilage (excluding the ground area of the original dwellinghouse); (c) the height of the part of the dwellinghouse enlarged, improved or altered would exceed the height of the highest part of the roof of the existing dwellinghouse; (d) the height of the eaves of the part of the dwellinghouse enlarged, improved or altered would exceed the height of the eaves of the existing dwellinghouse; (e) the enlarged part of the dwellinghouse would extend beyond a wall which— (i) forms the principal elevation of the original dwellinghouse; or (ii) fronts a highway and forms a side elevation of the original dwellinghouse; (f) subject to paragraph (g), the enlarged part of the dwellinghouse would have a single storey and— (i) extend beyond the rear wall of the original dwellinghouse by more than 4 metres in the case of a detached dwellinghouse, or 3 metres in the case of any other dwellinghouse, or (ii) exceed 4 metres in height; (g) ...for a dwellinghouse not on article 2(3) land nor on a site of special scientific interest, the enlarged part of the dwellinghouse would have a single storey and— (i) extend beyond the rear wall of the original dwellinghouse by more than 8 metres in the case of a detached dwellinghouse, or 6 metres in the case of any other dwellinghouse, or (ii) exceed 4 metres in height; (h) the enlarged part of the dwellinghouse would have more than a single storey and— (i) extend beyond the rear wall of the original dwellinghouse by more than 3 metres, or (ii) be within 7 metres of any boundary of the curtilage of the dwellinghouse being enlarged which is opposite the rear wall of that dwellinghouse; (i) the enlarged part of the dwellinghouse would be within 2 metres of the boundary of the curtilage of the dwellinghouse, and the height of the eaves of the enlarged part would exceed 3 metres; (j) the enlarged part of the dwellinghouse would extend beyond a wall forming a side elevation of the original dwellinghouse, and would— (i) exceed 4 metres in height, (ii) have more than a single storey, or (iii) have a width greater than half the width of the original dwellinghouse; ... (ja) any total enlargement (being the enlarged part together with any existing enlargement of the original dwellinghouse to which it will be joined) exceeds or would exceed the limits set out in sub-paragraphs (e) to (j); (k) it would consist of or include— (i) the construction or provision of a verandah, balcony or raised platform, (ii) the installation, alteration or replacement of a microwave antenna, (iii) the installation, alteration or replacement of a chimney, flue or soil and vent pipe, or (iv) an alteration to any part of the roof of the dwellinghouse ; or (l) the dwellinghouse is built under Part 20 of this Schedule (construction of new dwellinghouses).

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class A, paragraph A.1

Condition

In the case of a dwellinghouse on article 2(3) land, development is not permitted by Class A if— (a) it would consist of or include the cladding of any part of the exterior of the dwellinghouse with stone, artificial stone, pebble dash, render, timber, plastic or tiles; (b) the enlarged part of the dwellinghouse would extend beyond a wall forming a side elevation of the original dwellinghouse; or (c) the enlarged part of the dwellinghouse would have more than a single storey and extend beyond the rear wall of the original dwellinghouse; (d) any total enlargement (being the enlarged part together with any existing enlargement of the original dwellinghouse to which it will be joined) exceeds or would exceed the limits set out in sub-paragraphs (b) and (c).

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class A, paragraph A.2

Condition

Development is permitted by Class A subject to the following conditions— (a) the materials used in any exterior work (other than materials used in the construction of a conservatory) must be of a similar appearance to those used in the construction of the exterior of the existing dwellinghouse; (b) any upper-floor window located in a wall or roof slope forming a side elevation of the dwellinghouse must be— (i) obscure-glazed, and (ii) non-opening unless the parts of the window which can be opened are more than 1.7 metres above the floor of the room in which the window is installed; and (c) where the enlarged part of the dwellinghouse has more than a single storey, or forms an upper storey on an existing enlargement of the original dwellinghouse, the roof pitch of the enlarged part must, so far as practicable, be the same as the roof pitch of the original dwellinghouse.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class A, paragraph A.3

GOV.UK says

Extensions (including any extensions to the original house under Class A or under a separate planning permission) and other buildings must not exceed 50% of the curtilage. The 50% limit covers all buildings so will include existing and proposed outbuildings as well as any existing or proposed new extensions to a house. It will exclude the area covered by the original house but will include any later extensions or any separate detached buildings, even where they were built prior to 1948, or if the house was built after that date, built when the house itself was built (for example a detached garage or garden shed). In the diagram below, the maximum area that can be built on as permitted development, whether as an extension to the house or outbuildings erected under Class E, would be 50% of the white area.

GOV.UK, Permitted development rights for householders: technical guidance

GOV.UK says

A single-storey extension to a house which is not on article 2(3) land or on a site of special scientific interest can be larger than allowed under paragraph (f) above, but it must not extend beyond the rear of the original house by more than 8 metres if a detached house, or by more than 6 metres in any other case. In both cases, the total height of the extension must not be more than 4 metres. The rear wall or walls of a house will be those which are directly opposite the front of the house. These larger single-storey extensions, extending beyond the rear of the original house by more than 4 metres and less than 8 metres if a detached house, or by more than 3 metres and less than 6 metres in any other case, are subject to a neighbour consultation scheme to assess the impact of the proposed development on the amenity of their property. The requirements of the neighbour consultation scheme are set out in paragraph A.4 of Class A. Householders wishing to build a larger extension have to notify the local planning authority about the proposed extension and the local planning authority must give adjoining neighbours notice of the proposals and the opportunity to object. Works cannot commence until the local planning authority notifies the householder that no prior approval is required, or gives prior approval, or 42 days have passed without any decision by the local planning authority. Single-storey extensions that do not extend beyond the rear of the original house by more than 4 metres of a detached house, or by more than 3 metres in any other case, (as set out in paragraph (f) above) are not subject to a neighbour consultation scheme.

GOV.UK, Permitted development rights for householders: technical guidance

GOV.UK says

The neighbour consultation scheme is a form of prior approval which only applies to larger single storey rear extensions to houses built under permitted development rights. A householder wishing to build such an extension will need to notify the local planning authority, who will then consult the adjoining neighbours in relation to the potential impact on amenity. If adjoining neighbours raise any objections, the local planning authority will make a decision on whether the impact on the amenity of adjoining properties is acceptable and hence whether the work can proceed.

GOV.UK, When is permission required?

Condition

(2) Before beginning the development the developer must provide the following information to the local planning authority— (a) a written description of the proposed development including— (i) how far the enlarged part of the dwellinghouse extends beyond the rear wall of the original dwellinghouse; (ii) the maximum height of the enlarged part of the dwellinghouse; and (iii) the height of the eaves of the enlarged part of the dwellinghouse; (iv) where the enlarged part will be joined to an existing enlargement of the dwellinghouse, the information in sub-paragraphs (i) to (iii) must be provided in respect of the total enlargement (being the enlarged part together with the existing enlargement to which it will be joined); (b) a plan indicating the site and showing the proposed development and any existing enlargement of the original dwellinghouse to which the enlarged part will be joined ; (c) the addresses of any adjoining premises; (d) the developer's contact address; and (e) the developer's email address if the developer is content to receive communications electronically, together with any fee required to be paid.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class A, paragraph A.4(2)

Condition

(5) The local planning authority must notify each adjoining owner or occupier about the proposed development by serving on them a notice which— (a) describes the development by setting out the information provided to the authority by the developer under paragraph A.4(2)(a); (b) provides the address of the proposed development; (c) specifies the date when the information referred to in sub-paragraph (2) was received by the local planning authority and the date when the period referred to in sub-paragraph (10)(c) would expire; and (d) specifies the date (being not less than 21 days from the date of the notice) by which representations are to be received by the local planning authority.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class A, paragraph A.4(5)

Condition

(7) Where any owner or occupier of any adjoining premises objects to the proposed development, the prior approval of the local planning authority is required as to the impact of the proposed development on the amenity of any adjoining premises.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class A, paragraph A.4(7)

Condition

(10) The development must not begin before the occurrence of one of the following— (a) the receipt by the developer from the local planning authority of a written notice that their prior approval is not required; (b) the receipt by the developer from the local planning authority of a written notice giving their prior approval; or (c) the expiry of 42 days following the date on which the information referred to in sub-paragraph (2) was received by the local planning authority without the local planning authority notifying the developer as to whether prior approval is given or refused.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class A, paragraph A.4(10)

The law says

The enlargement, improvement or other alteration of a dwellinghouse.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class A, paragraph A

Can I convert my loft without planning permission?

GOV.UK says

Class B covers enlargement of houses through alterations or additions to the roof and Class C covers other alterations to the roof of a house.

GOV.UK, Permitted development rights for householders: technical guidance

Condition

Development is not permitted by Class B if— (a) permission to use the dwellinghouse as a dwellinghouse has been granted only by virtue of Class G, M, MA, N, P, PA or Q of Part 3 of this Schedule (changes of use); (b) any part of the dwellinghouse would, as a result of the works, exceed the height of the highest part of the existing roof; (c) any part of the dwellinghouse would, as a result of the works, extend beyond the plane of any existing roof slope which forms the principal elevation of the dwellinghouse and fronts a highway; (d) the cubic content of the resulting roof space would exceed the cubic content of the original roof space by more than— (i) 40 cubic metres in the case of a terrace house, or (ii) 50 cubic metres in any other case; (e) it would consist of or include— (i) the construction or provision of a verandah, balcony or raised platform, or (ii) the installation, alteration or replacement of a chimney, flue or soil and vent pipe; ... (f) the dwellinghouse is on article 2(3) land ; ... (g) the dwellinghouse is built under Part 20 of this Schedule (construction of new dwellinghouses) ; or (h) the existing dwellinghouse has been enlarged in reliance on the permission granted by Class AA (enlargement of a dwellinghouse by construction of additional storeys).

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class B, paragraph B.1

Condition

Development is permitted by Class B subject to the following conditions— (a) the materials used in any exterior work must be of a similar appearance to those used in the construction of the exterior of the existing dwellinghouse; (b) the enlargement must be constructed so that— (i) other than in the case of a hip-to-gable enlargement or an enlargement which joins the original roof to the roof of a rear or side extension— (aa) the eaves of the original roof are maintained or reinstated; and (bb) the edge of the enlargement closest to the eaves of the original roof is, so far as practicable, not less than 0.2 metres from the eaves, measured along the roof slope from the outside edge of the eaves; and (ii) other than in the case of an enlargement which joins the original roof to the roof of a rear or side extension, no part of the enlargement extends beyond the outside face of any external wall of the original dwellinghouse; and (c) any window inserted on a wall or roof slope forming a side elevation of the dwellinghouse must be— (i) obscure-glazed, and (ii) non-opening unless the parts of the window which can be opened are more than 1.7 metres above the floor of the room in which the window is installed.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class B, paragraph B.2

The law says

The enlargement of a dwellinghouse consisting of an addition or alteration to its roof.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class B, paragraph B

Can I build an outbuilding in my garden without planning permission?

GOV.UK says

Class E sets out the rules on permitted development for buildings etc within the curtilage of a house (see page 7). Buildings which are attached to the house are not permitted under Class E (they would be subject to the rules in Class A). Buildings under Class E should be built for purposes incidental to the enjoyment of the house. Paragraph E.4 of Class E indicates that purposes incidental to the enjoyment of the house includes the keeping of poultry, bees, pet animals, birds or other livestock for the domestic needs or personal enjoyment of the occupants of the house. But the rules also allow, subject to the conditions and limitations below, a large range of other buildings on land surrounding a house. Examples could include common buildings such as garden sheds, other storage buildings, garages, and garden decking as long as they can be properly be described as having a purpose incidental to the enjoyment of the house. A purpose incidental to a house would not, however, cover normal residential uses, such as separate self-contained accommodation or the use of an outbuilding for primary living accommodation such as a bedroom, bathroom, or kitchen.

GOV.UK, Permitted development rights for householders: technical guidance

Condition

Development is not permitted by Class E if— (a) permission to use the dwellinghouse as a dwellinghouse has been granted only by virtue of Class G, M, MA, N, P, PA or Q of Part 3 of this Schedule (changes of use); (b) the total area of ground covered by buildings, enclosures and containers within the curtilage (other than the original dwellinghouse) would exceed 50% of the total area of the curtilage (excluding the ground area of the original dwellinghouse); (c) any part of the building, enclosure, pool or container would be situated on land forward of a wall forming the principal elevation of the original dwellinghouse; (d) the building would have more than a single storey; (e) the height of the building, enclosure or container would exceed— (i) 4 metres in the case of a building with a dual-pitched roof, (ii) 2.5 metres in the case of a building, enclosure or container within 2 metres of the boundary of the curtilage of the dwellinghouse, or (iii) 3 metres in any other case; (f) the height of the eaves of the building would exceed 2.5 metres; (g) the building, enclosure, pool or container would be situated within the curtilage of a listed building; (h) it would include the construction or provision of a verandah, balcony or raised platform; (i) it relates to a dwelling or a microwave antenna; ... (j) the capacity of the container would exceed 3,500 litres ; or (k) the dwellinghouse is built under Part 20 of this Schedule (construction of new dwellinghouses).

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class E, paragraph E.1

Condition

In the case of any land within the curtilage of the dwellinghouse which is within— (a) an area of outstanding natural beauty; (b) the Broads; (c) a National Park; or (d) a World Heritage Site, development is not permitted by Class E if the total area of ground covered by buildings, enclosures, pools and containers situated more than 20 metres from any wall of the dwellinghouse would exceed 10 square metres.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class E, paragraph E.2

Condition

In the case of any land within the curtilage of the dwellinghouse which is article 2(3) land, development is not permitted by Class E if any part of the building, enclosure, pool or container would be situated on land between a wall forming a side elevation of the dwellinghouse and the boundary of the curtilage of the dwellinghouse.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class E, paragraph E.3

The law says

The provision within the curtilage of the dwellinghouse of—
  • (a) any building or enclosure, swimming or other pool required for a purpose incidental to the enjoyment of the dwellinghouse as such, or the maintenance, improvement or other alteration of such a building or enclosure; or
  • (b) a container used for domestic heating purposes for the storage of oil or liquid petroleum gas.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class E, paragraph E

The law says

For the purposes of Class E, “ purpose incidental to the enjoyment of the dwellinghouse as such ” includes the keeping of poultry, bees, pet animals, birds or other livestock for the domestic needs or personal enjoyment of the occupants of the dwellinghouse.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class E, paragraph E.4

Can I add a porch without planning permission?

The law says

The erection or construction of a porch outside any external door of a dwellinghouse.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class D, paragraph D

Condition

Development is not permitted by Class D if— (a) permission to use the dwellinghouse as a dwellinghouse has been granted only by virtue of Class G, M, MA, N, P, PA or Q of Part 3 of this Schedule (changes of use); (b) the ground area (measured externally) of the structure would exceed 3 square metres; (c) any part of the structure would be more than 3 metres above ground level; ... (d) any part of the structure would be within 2 metres of any boundary of the curtilage of the dwellinghouse with a highway ; or (e) the dwellinghouse is built under Part 20 of this Schedule (construction of new dwellinghouses).

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class D, paragraph D.1

Can I lay a driveway or patio without planning permission?

The law says

Development consisting of—
  • (a) the provision within the curtilage of a dwellinghouse of a hard surface for any purpose incidental to the enjoyment of the dwellinghouse as such; or
  • (b) the replacement in whole or in part of such a surface.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class F, paragraph F

Condition

Development is not permitted by Class F if— (a) permission to use the dwellinghouse as a dwellinghouse has been granted only by virtue of Class G, M, MA, N, P, PA or Q of Part 3 of this Schedule (changes of use); or (b) the dwellinghouse is built under Part 20 of this Schedule (construction of new dwellinghouses).

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class F, paragraph F.1

Condition

Development is permitted by Class F subject to the condition that where— (a) the hard surface would be situated on land between a wall forming the principal elevation of the dwellinghouse and a highway, and (b) the area of ground covered by the hard surface, or the area of hard surface replaced, would exceed 5 square metres, either the hard surface is made of porous materials, or provision is made to direct run-off water from the hard surface to a permeable or porous area or surface within the curtilage of the dwellinghouse.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class F, paragraph F.2

The law says

The formation, laying out and construction of a means of access to a highway which is not a trunk road or a classified road, where that access is required in connection with development permitted by any Class in this Schedule (other than by Class A of this Part).

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 2, Class B, paragraph B

How high can a fence, wall or gate be without planning permission?

The law says

The erection, construction, maintenance, improvement or alteration of a gate, fence, wall or other means of enclosure.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 2, Class A, paragraph A

Condition

Development is not permitted by Class A if— (a) the height of any gate, fence, wall or means of enclosure erected or constructed adjacent to a highway used by vehicular traffic would, after the carrying out of the development, exceed— (i) for a school, 2 metres above ground level, provided that any part of the gate, fence, wall or means of enclosure which is more than 1 metre above ground level does not create an obstruction to the view of persons using the highway as to be likely to cause danger to such persons; (ii) in any other case, 1 metre above ground level; (b) the height of any other gate, fence, wall or means of enclosure erected or constructed would exceed 2 metres above ground level; (c) the height of any gate, fence, wall or other means of enclosure maintained, improved or altered would, as a result of the development, exceed its former height or the height referred to in paragraph (a) or (b) as the height appropriate to it if erected or constructed, whichever is the greater; or (d) it would involve development within the curtilage of, or to a gate, fence, wall or other means of enclosure surrounding, a listed building.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 2, Class A, paragraph A.1

GOV.UK says

Listed building consent and planning permission are 2 separate regimes. For some proposed works both planning permission and listed building consent will be needed, but in other cases only one, or neither, is required.

GOV.UK, Conserving and enhancing the historic environment

GOV.UK says

This will depend on the particular works involved, but in general terms:
  • an application for planning permission is required if the works would usually require a planning application if the building was not listed
  • an application for planning permission is not required if the works would normally be permitted development, there are no restrictions on the permitted development rights in respect of listed buildings and the permitted development rights have not been removed locally
  • an application for planning permission is not required if the works would not constitute ‘development’ eg internal works to listed buildings

GOV.UK, Conserving and enhancing the historic environment

GOV.UK says

Any works to demolish any part of a listed building or to alter or extend it in a way that affects its character as a building of special architectural or historic interest require listed building consent, irrespective of whether planning permission is also required. For all grades of listed building, unless the list entry indicates otherwise, the listing status covers the entire building, internal and external, and may cover objects fixed to it, and also curtilage buildings or other structures. Undertaking works, or causing works to be undertaken, to a listed building which would affect its character as a building of special historic or architectural interest, without first obtaining listed building consent is a criminal offence under section 9 of the Planning (Listed Buildings and Conservation Areas) Act 1990. There is no fee for submitting an application for listed building consent.

GOV.UK, Conserving and enhancing the historic environment

GOV.UK says

Planning permission is required for the demolition of certain unlisted buildings in conservation areas (known as ‘relevant demolition’) – see ‘When is permission required?’ section of the guidance. Generally the requirement for planning permission for other works to unlisted buildings in a conservation area is the same as it is for any building outside a conservation area, although some permitted development rights are more restricted in conservation areas. Further information in ‘When is permission required?‘ section of guidance. Demolishing an unlisted building in a conservation area, without first obtaining planning permission where it is needed, is an offence under section 196D of the Town and Country Planning Act 1990. There is no fee for submitting an application for planning permission for the ‘relevant demolition’ of certain unlisted buildings in conservation areas.

GOV.UK, Conserving and enhancing the historic environment

The law says

(1) Subject to the following provisions of this Act, no person shall execute or cause to be executed any works for the demolition of a listed building or for its alteration or extension in any manner which would affect its character as a building of special architectural or historic interest, unless the works are authorised under section 8.

Planning (Listed Buildings and Conservation Areas) Act 1990, section 7(1)

The law says

(1) If a person contravenes section 7 he shall be guilty of an offence.
  • (2) Without prejudice to subsection (1), if a person executing or causing to be executed any works in relation to a listed building under a listed building consent fails to comply with any condition attached to the consent, he shall be guilty of an offence.

Planning (Listed Buildings and Conservation Areas) Act 1990, section 9(1) and (2)

Do I need planning permission to change a house into a small HMO?

GOV.UK says

The Town and Country Planning (Use Classes) Order 1987, as amended, groups common uses of land and buildings into classes. The uses within each class are, for planning purposes, considered to be broadly similar to one another. The different use classes are:
  • Part B (Schedule 1)
  • Class B2 – General Industrial
  • Class B8 – Storage and distribution
  • Part C (Schedule 1)
  • Class C1 – Hotels
  • Class C2 – Residential institutions
  • Class C2A – Secure residential institutions
  • Class C3 – Dwellinghouses
  • Class C4 – Small Houses in multiple occupation
  • Part A (Schedule 2) Commercial, Business and Service
  • Class E – Commercial, Business and Service
  • Part B (Schedule 2) Local Community and Learning
  • Class F.1 Learning and non-residential institutions
  • Class F.2 Local community

GOV.UK, When is permission required?

GOV.UK says

A change of use of land or buildings requires planning permission if it constitutes a material change of use. There is no statutory definition of ‘material change of use’; however, it is linked to the significance of a change and the resulting impact on the use of land and buildings. Whether a material change of use has taken place is a matter of fact and degree and this will be determined on the individual merits of a case. If planning permission is required for change of use, there may be permitted development rights which allow change of use without having to make a planning application.

GOV.UK, When is permission required?

GOV.UK says

Movement from one primary use to another within the same use class is not development, and does not require planning permission. The Commercial, Business and Service use class provides for use, or part use, for all or any of the purposes set out in that Class.

GOV.UK, When is permission required?

ExceptionTown and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 3, Class L, paragraph L.1

Exception

Development is not permitted by Class L if it would result in the use— (a) as two or more separate dwellinghouses falling within Class C3 (dwellinghouses) of the Schedule to the Use Classes Order of any building previously used as a single dwellinghouse falling within Class C4 (houses in multiple occupation) of that Schedule; or (b) as two or more separate dwellinghouses falling within Class C4 (houses in multiple occupation) of that Schedule of any building previously used as a single dwellinghouse falling within Class C3 (dwellinghouses) of that Schedule.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 3, Class L, paragraph L.1

GOV.UK says

Planning permission may not be required to sub-divide a building where:
  • sub-division does not involve physical works that amount to development;
  • the use of any newly formed units after a building has been sub-divided falls within the same use class as the building’s existing primary use before it was sub-divided, or there is a permitted development right allowing the new use; and/or
  • the sub-division does not involve converting a single dwelling house to contain more than one residential unit.

GOV.UK, When is permission required?

The law says

Class C3. Dwellinghouses Use as a dwellinghouse (whether or not as a sole or main residence) by—
  • (a) a single person or by people to be regarded as forming a single household;
  • (b) not more than six residents living together as a single household where care is provided for residents; or
  • (c) not more than six residents living together as a single household where no care is provided to residents (other than a use within Class C4).

Town and Country Planning (Use Classes) Order 1987, Schedule 1, Class C3

The law says

For the purposes of Class C3(a) “single household” shall be construed in accordance with section 258 of the Housing Act 2004.

Town and Country Planning (Use Classes) Order 1987, Schedule 1, interpretation of Class C3

The law says

Class C4. Houses in multiple occupation

Town and Country Planning (Use Classes) Order 1987, Schedule 1, Class C4

The law says

For the purposes of Class C4 a “house in multiple occupation” does not include a converted block of flats to which section 257 of the Housing Act 2004 applies but otherwise has the same meaning as in section 254 of the Housing Act 2004.

Town and Country Planning (Use Classes) Order 1987, Schedule 1, interpretation of Class C4

The law says

Development consisting of a change of use of a building—
  • (a) from a use falling within Class C4 (houses in multiple occupation) of the Schedule to the Use Classes Order, to a use falling within Class C3 (dwellinghouses) of that Schedule;
  • (b) from a use falling within Class C3 (dwellinghouses) of the Schedule to the Use Classes Order, to a use falling within Class C4 (houses in multiple occupation) of that Schedule.

Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 3, Class L, paragraph L

Do I need building regulations approval as well as planning permission?

GOV.UK says

You must check if you need approval before you construct or change buildings in certain ways. You do not need to get approval yourself if you use someone registered with a competent person scheme. Find out about the rules in Scotland and Northern Ireland. Building regulations approval is different from planning permission. You might need both.

GOV.UK, Building regulations approval: When you need approval

GOV.UK says

The Building Regulations 2010 cover the construction and extension of buildings. You might also need building regulations approval for many alteration projects, including if you plan to:
  • replace fuse boxes and connected electrics
  • install a bathroom that will involve plumbing
  • change electrics near a bath or shower
  • put in a fixed air-conditioning system
  • replace windows and doors
  • replace roof coverings on pitched and flat roofs
  • install or replace a heating system
  • add extra radiators to a heating system

GOV.UK, Building regulations approval: When you need approval

GOV.UK says

You could need approval, or to follow special rules, for works not listed here – so always research your particular project. Check with a building control body if you cannot decide if you need approval.

GOV.UK, Building regulations approval: When you need approval

GOV.UK says

You do not need to apply for approval if the work is exempt or not covered by building regulations. You also do not need to apply for approval if the work is done by someone registered with a competent person scheme.

GOV.UK, Building regulations approval: When you do not need approval

GOV.UK says

You do not need building regulations approval for exempt projects, including:
  • most repairs, replacements and maintenance work (except heating systems, oil tanks, fuse boxes and glazing units)
  • new power and lighting points, or changes to existing circuits (except around baths and showers)
  • replacing baths, toilets, basins and sinks
  • installing insulation in roof spaces or under timber floors
  • some hot water storage systems holding less than 15 litres
  • gutters or downpipes
  • external doors, if less than half of the door is glazed

GOV.UK, Building regulations approval: When you do not need approval

GOV.UK says

You must meet safety and energy efficiency standards even if you do not need formal approval.

GOV.UK, Building regulations approval: When you do not need approval

GOV.UK says

Competent person schemes are a way for tradespeople to prove their ability to carry out certain work to required standards, instead of you applying for building regulations approval.

GOV.UK, Building regulations approval: Use a competent person scheme

GOV.UK says

You may need approval from a building control body. You can either choose your local authority’s building control department or a private registered building control approver.

GOV.UK, Building regulations approval: When you need approval

GOV.UK says

Even if a planning application is not needed, other consents may be required under other regimes. The following list is not exhaustive but illustrates some of the other permissions or consents that may need to be obtained before carrying out development:
  • works to protected trees
  • advertisement consent
  • listed building consent
  • hazardous substances consent
  • environmental permits/licences
  • building regulations
It is the developer’s responsibility to ensure that any necessary permissions, consents and permits (including permits and licences outside of planning such as those granted under the Licensing Act 2003 and Gambling Act 2005 ) are in place when required.

GOV.UK, When is permission required?

The law says

(1) In these Regulations “ building work ” means—
  • (a) the erection or extension of a building;
  • (b) the provision or extension of a controlled service or fitting in or in connection with a building;
  • (c) the material alteration of a building, or a controlled service or fitting, as mentioned in paragraph (2);
  • (d) work required by regulation 6 (requirements relating to material change of use);
  • (e) the insertion of insulating material into the cavity wall of a building;
  • (f) work involving the underpinning of a building;
  • (g) work required by regulation 22 (requirements relating to a change of energy status);
  • (h) work required by regulation 23 (requirements relating to thermal elements);
  • (i) work required by regulation 28 (consequential improvements to energy performance).

The Building Regulations 2010, regulation 3(1)

The law says

(2) An alteration is material for the purposes of these Regulations if the work, or any part of it, would at any stage result—
  • (a) in a building or controlled service or fitting not complying with a relevant requirement where previously it did; or
  • (b) in a building or controlled service or fitting which before the work commenced did not comply with a relevant requirement, being more unsatisfactory in relation to such a requirement.

The Building Regulations 2010, regulation 3(2)

What happens if I do building work without approval?

GOV.UK says

The person doing the work could be prosecuted and fined if they do not comply with building regulations. The relevant building control body - your local authority or the BSR - could make you pay to fix faulty work. Without approval you will not have the certificates of compliance you may need when you want to sell your home.

GOV.UK, Building regulations approval: When you need approval

GOV.UK says

You can apply for ‘regularisation’ – retrospective approval for work already carried out without consent – from a local authority BCB only. Only work carried out after 11 November 1985 can be approved in this way. You might need to make alterations before your BCB can agree the work complies and give you a regularisation certificate. You may have to correct the work or pay a fine if building regulations are not followed.

GOV.UK, Building regulations approval: How to apply

The law says

(1) A person who contravenes a provision of building regulations, or a requirement imposed by virtue of any such provision, commits an offence.

Building Act 1984, section 35(1)

The law says

(4) A person guilty of an offence under this section is liable—
  • (a) on summary conviction, to imprisonment for a term not exceeding the maximum summary term for either-way offences or a fine (or both);
  • (b) on conviction on indictment, to imprisonment for a term not exceeding two years or a fine (or both);
and (in either case) is liable on summary conviction to a further fine not exceeding level 1 on the standard scale for each day on which the default continues after the initial conviction.

Building Act 1984, section 35(4)

The law says

(1) If any work to which building regulations are applicable contravenes any of those regulations or a requirement imposed by virtue of any of those regulations, the building control authority, without prejudice to their right to take proceedings for a fine in respect of the contravention, may by notice require the owner—
  • (a) to pull down or remove the work, or
  • (b) if he so elects, to effect such alterations in it as may be necessary to make it comply with the regulations.

Building Act 1984, section 36(1)

What happens if I do work without planning permission?

GOV.UK says

If development is carried out without the necessary planning permission, this may lead to enforcement action.

GOV.UK, When is permission required?

GOV.UK says

A breach of planning control is defined in section 171A of the Town and Country Planning Act 1990 as:
  • the carrying out of development without the required planning permission; or
  • failing to comply with any condition or limitation subject to which planning permission has been granted.
Any contravention of the limitations on, or conditions belonging to, permitted development rights, under the Town and Country Planning (General Permitted Development) (England) Order 2015, constitutes a breach of planning control against which enforcement action may be taken.

GOV.UK, Enforcement and post-permission matters

GOV.UK says

The time limits for taking enforcement action are set out in section 171B of the Town and Country Planning Act 1990 (see also The Planning Act 2008 (Commencement No. 8) and Levelling-up and Regeneration Act 2023 (Commencement No. 4 and Transitional Provisions) Regulations 2024 for transitional arrangements). In most cases, development becomes immune from enforcement if no action is taken:
  • within 10 years of substantial completion for a breach of planning control consisting of operational development where substantial completion took place on or after 25 April 2024
  • within 10 years for an unauthorised change of use to a single dwellinghouse where the change of use took place on or after 25 April 2024
  • within 4 years of substantial completion for a breach of planning control consisting of operational development where substantial completion took place before 25 April 2024;
  • within 4 years for an unauthorised change of use to a single dwellinghouse where the change of use took place before 25 April 2024
  • within 10 years for any other breach of planning control (essentially other changes of use)

GOV.UK, Enforcement and post-permission matters

GOV.UK says

A local planning authority can invite a retrospective application. In circumstances where the local planning authority consider that an application is the appropriate way forward to regularise the situation, the owner or occupier of the land should be invited to submit their application ( section 73A of the Town and Country Planning Act 1990 ) without delay. It is important to note that:
  • although a local planning authority may invite an application, it cannot be assumed that permission will be granted, and the local planning authority should take care not to fetter its discretion prior to the determination of any application for planning permission – such an application must be considered in the normal way;

GOV.UK, Enforcement and post-permission matters

GOV.UK says

An enforcement notice should enable every person who receives a copy to know:
  • exactly what, in the local planning authority’s view, constitutes the breach of planning control; and
  • what steps the local planning authority require to be taken, or what activities are required to cease to remedy the breach
The local planning authority must enclose with the enforcement notice information about how to make an appeal. This information is contained in the information sheet provided by the Planning Inspectorate which local planning authorities should use. Every copy of the enforcement notice must also be accompanied by an Explanatory Note containing the information specified in regulation 5 of the Town and Country Planning (Enforcement Notices and Appeals) (England) Regulations 2002 (as amended). Enforcement notices are not improved by over-elaborate wording or legalistic terms: plain English is always preferable. An eventual prosecution under section 179 of the Act may fail if the Court finds the terms of the notice incomprehensible to the lay person. ## Example enforcement notice – operational development ODT, 9.37 KB This file is in an OpenDocument format

GOV.UK, Enforcement and post-permission matters

GOV.UK says

There is a right of appeal against an enforcement notice.

GOV.UK, Enforcement and post-permission matters

GOV.UK says

Your local planning authority may send you an enforcement notice if you’ve built or changed something without planning permission. You can appeal against an enforcement notice if you own, rent or lawfully occupy the property or land it applies to. Anyone can comment on an appeal. There’s no fee for appealing, unless you also apply for planning permission.

GOV.UK, Appeal against an enforcement notice: When you can appeal

GOV.UK says

Your appeal must be received before the date the enforcement notice takes effect.

GOV.UK, Appeal against an enforcement notice: When you can appeal

GOV.UK says

It is an offence not to comply with an enforcement notice, once the period for compliance has elapsed, and there is no outstanding appeal. A person guilty of an offence is liable on conviction to an unlimited fine. In determining the amount of any fine, the Court is to have regard to any financial benefit which has been accrued or appears likely to accrue in consequence of the offence ( section 179 of the Town and Country Planning Act 1990 ). Therefore, prosecuting authorities should always be ready to give any available details about the proceeds resulting, or likely to result, from the offence, so that the Court may take them into account. Where a local planning authority achieves a successful conviction for failure to comply with an enforcement notice, they can apply for a Confiscation Order, under the Proceeds of Crime Act 2002, to recover the financial benefit obtained through unauthorised development.

GOV.UK, Enforcement and post-permission matters

The law says

(1) For the purposes of this Act—
  • (a) carrying out development without the required planning permission; or
  • (b) failing to comply with any condition or limitation subject to which planning permission has been granted,
constitutes a breach of planning control.

Town and Country Planning Act 1990, section 171A(1)

The law says

(1) Where there has been a breach of planning control consisting in the carrying out without planning permission of building, engineering, mining or other operations in, on, over or under land, no enforcement action may be taken after the end of the period of—
  • (a) in the case of a breach of planning control in England, ten years beginning with the date on which the operations were substantially completed, and
  • (b) in the case of a breach of planning control in Wales, four years beginning with the date on which the operations were substantially completed.

Town and Country Planning Act 1990, section 171B(1)

The law says

(2) Where there has been a breach of planning control consisting in the change of use of any building to use as a single dwellinghouse, no enforcement action may be taken after the end of the period of—
  • (a) in the case of a breach of planning control in England, ten years beginning with the date of the breach, and
  • (b) in the case of a breach of planning control in Wales, four years beginning with the date of the breach.

Town and Country Planning Act 1990, section 171B(2)

The law says

(3) In the case of any other breach of planning control, no enforcement action may be taken after the end of the period of ten years beginning with the date of the breach.

Town and Country Planning Act 1990, section 171B(3)

The law says

(1) The local planning authority may issue a notice (in this Act referred to as an “ enforcement notice ”) where it appears to them—
  • (a) that there has been a breach of planning control; and
  • (b) that it is expedient to issue the notice, having regard to the provisions of the development plan and to any other material considerations.

Town and Country Planning Act 1990, section 172(1)

The law says

(1) Where, at any time after the end of the period for compliance with an enforcement notice, any step required by the notice to be taken has not been taken or any activity required by the notice to cease is being carried on, the person who is then the owner of the land is in breach of the notice.
  • (2) Where the owner of the land is in breach of an enforcement notice he shall be guilty of an offence.

Town and Country Planning Act 1990, section 179(1) and (2)

What can I do if my planning application is refused?

GOV.UK says

You can appeal against a householder planning decision if you were refused permission for reasons that you think go against the LPA’s development plan or planning policy. You can usually find these on their website.

GOV.UK, Appeal against a householder planning decision: Overview

GOV.UK says

Householder planning applications cover small projects such as extensions, conservatories or loft conversions. Use the appeal against a full planning decision service to appeal any of the following:
  • decisions made about bigger projects, like changing the use of a building or doing major structural work
  • planning permission conditions for any type of project

GOV.UK, Appeal against a householder planning decision: Overview

GOV.UK says

If your application was refused, you can appeal for up to 12 weeks from the date on the decision letter you got from your local planning authority (LPA).

GOV.UK, Appeal against a householder planning decision: How long you have to appeal

GOV.UK says

You’ll have less time to appeal if you received an enforcement notice in the last 2 years. If you received the enforcement notice before your application was refused, you have 28 days from the date on your decision letter to appeal. If the enforcement notice came after your application was refused, you need to appeal by whichever of these dates is sooner:
  • 28 days from the date you received the enforcement notice
  • 6 months from the date on your application decision letter

GOV.UK, Appeal against a householder planning decision: How long you have to appeal

Where to get help

Citizens Advice: 0800 144 8848 (England), 0800 702 2020 (Wales).

Ways to contact Citizens Advice in England

  • Adviceline: 0800 144 8848. Usually open Monday to Friday, 9am to 5pm, not on public holidays. Free from mobiles and landlines. At busy times you might wait up to an hour. If you call from a mobile you'll be asked for your postcode.
  • Cannot hear or speak on the phone: Relay UK. Dial 18001 then 0800 144 8848, using the app or a textphone. There's no extra charge.
  • Money or debt: debt helpline 0800 240 4420, Monday to Friday 9am to 8pm, Saturday 9.30am to 1pm, not on public holidays. Relay UK: 18001 then 0800 240 4420.
  • Online chat with an adviser: debt problems (Monday to Friday 9am to 8pm, Saturday 9.30am to 1pm); claiming Universal Credit (Monday to Friday 8am to 6pm); energy bills or supply, consumer problems, or any other problem (Monday to Friday 9am to 5pm).
  • Your local Citizens Advice: search by postcode or town on the Citizens Advice website. Most can only help if you live or work in their area.

Ways to contact Citizens Advice in Wales

  • Advicelink: 0800 702 2020. Monday to Friday 8am to 7pm, Saturday 9am to 1pm, not on public holidays. Free from mobiles and landlines. At busy times you might wait up to an hour.
  • Cannot hear or speak on the phone: Relay UK. Dial 18001 then 0800 702 2020, using the app or a textphone. There's no extra charge.
  • Online chat with an adviser: usually Monday to Friday, 9am to 5pm.
  • Your local Citizens Advice: search by postcode or town on the Citizens Advice website.

Sources

Quotes from legislation and GOV.UK contain public sector information licensed under the Open Government Licence v3.0.

Important disclaimer: This guide covers planning permission for homes in England as at 27 November 2026. It is general information, not legal advice.

Comments

Comments are loading…